SO3 Plant Maintenance and Spares Supply at Matla Power Station for a period of five (5) years, on an as-and-when-required basis during planned outages…
ESKOM
State-owned company · Tender (request for bid) · Mpumalanga · Tender no. E3791GXMPMAT
9 days left
Closes: Monday, 7 December 2026 at 10:00 SAST
Requirements, and how we know them
- CIDB grade 7 or higher (Read from official document)
- At least 70% on functionality (Read from official document)
- Tender documents (Not confirmed)
- CSD registration (General guidance)
- Valid tax compliance status (General guidance)
- Standard SBD forms (General guidance)
Find it on eTenders: search for E3791GXMPMAT
Official documents
- Annexure D.pdf
- Annexure C.pdf
- Annexure E.pdf
- Authorisation Form - Final.f.pdf
- Attachment 5_ANNEXURE A Integrity Declaration Form.pdf
- Annexure B Safety Requirements.pdf
- Annexure L – Authority to Submit a Tender (Returnable Schedule) Template.pdf
- Annexure L – Authority to Submit a Tender (Returnable Schedule) Template - Copy.pdf
- Attachment 5_ANNEXURE A Integrity Declaration Form - Copy.pdf
- Annexure B Safety Requirements - Copy.pdf
- Eskom - Standard Conditions of Tender - final.pdf
- Declaration of Fair Bidding Practices.pdf
- Eskom - Standard Conditions of Tender - final - Copy.pdf
- Conditions to tender.pdf
- Authority to submit a tender Nov 2012 - Copy.pdf
- Code of Ethics.pdf
- Environmental Contractors Assessment Form.pdf
- Eskom General Conditions of Purchase - 31 May 2024 - Copy.pdf
- Contractors Assessment Form.pdf
- Authority to submit a tender Nov 2012.pdf
- E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 - Copy.pdf
- Eskom Standard Condition.pdf
- E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
- Eskom Supplier Integrity Pact - 02 June 2023 - Copy.pdf
- E-tendering Help Manual for supplier - 27 January 2025 - Copy.pdf
- SBD 1 - Invitation to Bid..pdf
- Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024 - Copy.pdf
- No 4 SBD 6.2 Local Content in terms of PPR 2017 - Copy.pdf
- Standard Bidding Document (SDB) 4_Annexure A - Copy.pdf
- NDA Vendors.pdf
- SBD 6.2.pdf
- No 5 ANNEXURE A Integrity Declaration Form (1) - Copy.pdf
- SBD 6.1 - Preference Points Claims Form..pdf
- No 11 Designated items Local Content percentages THRESHOLDS - Copy.pdf
- Supplier Integrity Pack - Copy.pdf
- SWORN AFFIDAVIT – B-BBEE EXEMPTED MICRO ENTERPRISE - GENERAL.pdf
- TAX EVALUATION.pdf
- Supplier Risks identified Rev 1 Oct 2009.pdf
- Supplier_Evaluation_Pack_Template_for_01_March_2024_to_29_February_2025.pdf
- SO3 Long Term Contract Signed TE.pdf
- Invitation to Tender (ITT) - SO3 Maintenance services signed.pdf
- Unit 1-6 Sulphur plant Scope for long term 5 Year contract.pdf
- NEC3 TSC3 SO3 PLANT for 5 years on as an when required basis for Matla Power Station Final 2.pdf
- Invitation to Tender (ITT) - SO3 Maintenance services.revised.2.pdf
- Addendum SO3 Maintenance services contract.final.rev.pdf
- NEC3 TSC3 SO3 PLANT for 5 years on as an when required basis for Matla Power Station Final rev.pdf
- Unit 1-6 Sulphur plant Scope for long term 5 Year contract (correted).pdf
Official contact
Phindile Masina Contracts · masinap@eskom.co.za · 017-615-2945
Before you submit
- Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business. - Tax compliance status valid on the closing date
Check it on SARS eFiling before 07 Dec 2026. A status that lapses before closing can cost you the award. - CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents. - Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim. - CIDB grade 7 or higher
Active on the CIDB register on the closing date, or through a joint venture that meets the grade. - Reach 70% on functionality
Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for. - The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT. - Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid. - Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 06 Dec 2026, and check the address or upload method twice.