The supply, delivery, installation, commissioning, operation and maintenance of iot ready led luminaires, controllers, and central management systems (cms) at the elidz under an energy performance contract, including full financing and shared energy savings over the agreed contract period
East London Industrial Development Zone SOC Ltd (ELIDZ)
State-owned company · Not stated · Eastern Cape · Tender no. ES/26/RWL/EnPC/02
8 days left
Closes: Monday, 7 December 2026 at 12:00 SAST
Compulsory briefing: 25 Nov 2026 12:00 (Non-Compulsory virtual meeting)
Requirements, and how we know them
- CIDB grade 4EB or higher (Read from official document)
- Compulsory briefing (already held) (Read from official document)
- At least 70% on functionality (Read from official document)
- Tender documents (Not confirmed)
- CSD registration (General guidance)
- Valid tax compliance status (General guidance)
- Standard SBD forms (General guidance)
Official documents
Before you submit
- Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business. - Tax compliance status valid on the closing date
Check it on SARS eFiling before 07 Dec 2026. A status that lapses before closing can cost you the award. - CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents. - Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim. - Briefing attendance certificate
Include proof that you attended the compulsory briefing. Bidders who missed it are disqualified. - CIDB grade 4EB or higher
Active on the CIDB register on the closing date, or through a joint venture that meets the grade. - Reach 70% on functionality
Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for. - The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT. - Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid. - Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 06 Dec 2026, and check the address or upload method twice.