Closes
In 6 days
Friday, 4 December 2026 at 11:00 SAST
Listed as open, but the official source has not confirmed it since 24 Nov 2026, 16:54 (SAST). It may have closed or changed: check the official page.
Closing soon. Aim to submit a day early, by 03 Dec 2026: late bids aren't considered.
Add to calendar:GoogleApple or Outlook
Can you bid?
Confirmed for this tender:
CIDB grade 7EP or higher · Compulsory briefing (already held) · At least 10% on functionality
Next step
Read the requirements below, then check the official documents before you commit time.
Check against your business, freeNot recently confirmed. 16 official documents. Missing from the listing: estimated value.
In short
- What they want
- BID-2653GS: Provision of Power factor correction at crown substation
- What must be delivered
- This scope details a Network study, Substation Design, Equipment supply, installation, testing and commissioning of all new equipment and related control and measurement systems at the Substation including SCADA system for enhanced monitoring and control of systems, implementation of overcurrent, earth fault and arc protection and the installation of new AC/DC panel, battery cabinet and battery charger. Additionally, it will include the installing of the new capacitor bank with controls and completing building alternations (Civil and Electrical related).From Annexure E - Project Scope for Power Factor Correction - Crown - Distribution Substation.pdf, page 6. Read the full scope in the documents.
- How much and how long
- 5 years
- Delivery address
- 40 Heronmere road, Reuven, Johannesburg, 2091
- Who can bid
- CIDB grade 7EP or higher · Attended the compulsory briefing
- How it's scored
- You need at least 10% on functionality (quality) before price counts
- Specific goals: Black ownership, Women ownership, Youth ownership, People with disabilities
A summary from the listing and the tender's documents. The official documents are the final word.
Key facts
- Estimated value
- Not published. We never estimate one.Work out your preference points
- Industry
- Electrical
- Briefing session
- Compulsory, 29 Oct 2026, 10:00City Power Johannesburg, 40 Heronmere Road, Rueven at Blue Square
- CIDB grading
- Grade 7EP or higher
- Functionality threshold
- 10%
- Type
- Tender (request for bid)Published as “Request for Bid(Open-Tender)”
- Delivery location
- 40 Heronmere road, Reuven, Johannesburg, 2091
- Published
- 21 Oct 2026
Can your business bid on this?
ZA Network guidance, not part of the official listing.
What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, Functionality threshold, Compulsory briefing
- CSD (Central Supplier Database)
- National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
- Tax compliance status (SARS tax status, checked with a PIN)
- SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
- B-BBEE (Broad-Based Black Economic Empowerment)
- A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
- SBD forms (Standard Bidding Documents)
- National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
- CIDB (Construction Industry Development Board)
- The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
- Functionality threshold (The minimum quality score)
- Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.
- Compulsory briefing (A compulsory site meeting or clarification session)
- A meeting the buyer holds before closing, at the site or online. When it is compulsory, a bidder who did not attend and sign the register is disqualified, whatever the bid says.
General explanations of South African public procurement, not this tender's requirements: the tender pack decides.
Check it against your business
Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.
Confirmed for this tender
CIDB grade 7EP or higherRead from official document
The tender asks for this grading or higher.
Source: Bid Document - Power Factor Correction - 2653GS.pdf · page 8: “…will result in the bidder not being evaluated further) • Tenderers should have a valid CIDB contractor grading of 7EP or Higher • Provide valid COIDA certificate from the Department of Labour or any other authorized relevant entities F2.7 The arrangements…”
Compulsory briefing (already held)Stated in listing
Bidders who don't attend are disqualified.
Source: the official listing
At least 10% on functionalityRead from official document
Bids below the threshold aren't scored on price.
Source: Bid Document - Power Factor Correction - 2653GS.pdf · page 75: “…certificate from the Department of Labour or any other authorized relevant entities MINIMUM THRESHOLD OF 90% ON TECHNICAL FUNCTIONALITY MUST BE ACHIEVED FAILING WHICH, THE BID WILL NOT BE FURTHER EVALUATED. 2nd Stage Evaluation: A minimum threshold of 90% must be achieved to…”
Not confirmed
Tender documents reviewed: 8 / 16 relevant documentsNot confirmed
8 documents still need review: Annexure A - Crown - Distribution Substation - Aerial View.PNG (a format we can't read); Annexure F - Substation feeder board Single Line Diagram.pdf (scanned pages that can't be read automatically); Annexure B - Crown - Distribution Substation - Cable Routes – 1 - Copy.tif (a format we can't read); Annexure C - Crown - Distribution Substation - Cable Routes – 2.pdf (scanned pages that can't be read automatically); Annexure B - Crown - Distribution Substation - Cable Routes – 1 - Copy.pdf (scanned pages that can't be read automatically); Annexure B - Crown - Distribution Substation - Cable Routes – 1.tif (a format we can't read); Annexure D - Crown - Distribution Substation Drawings.jpg (a format we can't read); 14. CP_TSSPEC_053 REV 7 ACCESSORIES FOR MEDIUM VOLTAGE POWER CABLE FOR SYSTEMS WITH NOMINAL VOLTAGES OF 11KV TO 33KV_Signatures.pdf (scanned pages that can't be read automatically). Requirements in them aren't confirmed.
Check the official documents before you decide to bid.
We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.
Where and how to submit
Deliver to the tender box
Must arrive before Friday, 4 December 2026 at 11:00 SAST. Late bids are never accepted.
“…011 490 7681 E-MAIL ADDRESS knnete@citypower.co.za SUBMISSION OF BIDS BIDS MUST BE SUBMITTED AT THE TENDER BOX SITUATED AT 40 HEREONMERE ROAD, REUVEN, BOOYSENS (Tender Advice Centre) (Please note that no e-mailed or faxed documents will be accepted) COMPULSORY MANDATORY REQUIREMENTS Tenderers should have a valid CIDB contractor grading of 7EP or Higher Provide valid…” (BID ADVERT - 2653GS - Power Factor Correction.docx, page 1)
- Tender documents (the submission details are in the bid document)
- Find it on eTenders: search for BID-2653GS
- Ask KATLEGO NNETE: knnate@citypower.co.za
- Deliver it by hand or courier before the closing time, in a sealed envelope marked with the bid number. Late bids are not accepted.
ZA Network never submits bids for you. The tender documents are the final word on where and how.
Before you submit
Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified
Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.
Tax compliance status valid on the closing date
Check it on SARS eFiling before 04 Dec 2026. A status that lapses before closing can cost you the award.
CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.
Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.
Briefing attendance certificate
Include proof that you attended the compulsory briefing. Bidders who missed it are disqualified.
CIDB grade 7EP or higher
Active on the CIDB register on the closing date, or through a joint venture that meets the grade.
Reach 10% on functionality
Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for.
The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.
Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.
Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 03 Dec 2026, and check the address or upload method twice.
Official documents
- pngAnnexure A - Crown - Distribution Substation - Aerial View.PNGFrom eTenders, 21 Oct 2026Not read for requirements: a format we can't read. Read it yourself before you rely on this page.(opens in a new tab)
- docxBID ADVERT - 2653GS - Power Factor Correction.docxFrom eTenders, 21 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure F - Substation feeder board Single Line Diagram.pdfFrom eTenders, 21 Oct 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- tifAnnexure B - Crown - Distribution Substation - Cable Routes – 1 - Copy.tifFrom eTenders, 21 Oct 2026Not read for requirements: a format we can't read. Read it yourself before you rely on this page.(opens in a new tab)
- pdfAnnexure C - Crown - Distribution Substation - Cable Routes – 2.pdfFrom eTenders, 21 Oct 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdfAnnexure B - Crown - Distribution Substation - Cable Routes – 1 - Copy.pdfFrom eTenders, 21 Oct 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdfBID ADVERT - 2653GS - Power Factor Correction.pdfFrom eTenders, 21 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure G - BOQ - Generic - Preliminary and General.pdfFrom eTenders, 21 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure E - Project Scope for Power Factor Correction - Crown - Distribution Substation.pdfFrom eTenders, 21 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfBid Document - Power Factor Correction - 2653GS.pdfFrom eTenders, 21 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- tifAnnexure B - Crown - Distribution Substation - Cable Routes – 1.tifFrom eTenders, 21 Oct 2026Not read for requirements: a format we can't read. Read it yourself before you rely on this page.(opens in a new tab)
- pdfAnnexure H - BOQ - Generic - Substations.pdfFrom eTenders, 21 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- jpgAnnexure D - Crown - Distribution Substation Drawings.jpgFrom eTenders, 21 Oct 2026Not read for requirements: a format we can't read. Read it yourself before you rely on this page.(opens in a new tab)
- pdfBID ADVERT - 2653GS - Power Factor Correction.pdfFrom eTenders, 21 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfBid Document - Power Factor Correction - 2653GS.pdfFrom eTenders, 21 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf14. CP_TSSPEC_053 REV 7 ACCESSORIES FOR MEDIUM VOLTAGE POWER CABLE FOR SYSTEMS WITH NOMINAL VOLTAGES OF 11KV TO 33KV_Signatures.pdfFrom eTenders, 27 Oct 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
Read from the official documents
What the tender documents say
Read by rules from 8 of 16 documents (8 couldn't be read: scanned pages, a format we can't read, or a download that failed; each one is marked under Official documents), 01 Nov 2026, 22:50. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.
- CIDB grading
Grade 7EP or higher
“…will result in the bidder not being evaluated further) • Tenderers should have a valid CIDB contractor grading of 7EP or Higher • Provide valid COIDA certificate from the Department of Labour or any other authorized relevant entities F2.7 The arrangements…” (Bid Document - Power Factor Correction - 2653GS.pdf, page 8)
- Functionality threshold
Minimum 90% to be evaluated on price
“…certificate from the Department of Labour or any other authorized relevant entities MINIMUM THRESHOLD OF 90% ON TECHNICAL FUNCTIONALITY MUST BE ACHIEVED FAILING WHICH, THE BID WILL NOT BE FURTHER EVALUATED. 2nd Stage Evaluation: A minimum threshold of 90% must be achieved to…” (Bid Document - Power Factor Correction - 2653GS.pdf, page 75)
- Briefing
Briefing session on 28 October 2026 (the document doesn't say whether it's compulsory)
“…date: BID NUMBER 2653GS PRE -BID/BRIEFING SESSION DATE: 28 OCTOBER 2026 TIME: 10:00AM GPS CO-ORDINATES HEAD OFFICE 40 HERONMERE ROAD, REUVEN 28°1'49.607"E 26°13'53.692"S CROWN SUBSTATION CROWN DS, BOOYSENS RESERVE ROAD, JOHANNESBURG 27°59'46.9"E 26°13'56.4"S BID ADVERTISING DATE 21 OCTOBER 2026 BID CLOSING DATE 04 DECEMBER 2026 BID CLOSING TIME…” (BID ADVERT - 2653GS - Power Factor Correction.docx, page 1)
- Specific goals
Black ownership, Women ownership, Youth ownership, People with disabilities
“…system) (To be completed by the tenderer) Enterprises owned by black people with at least 51% shareholding 4 Enterprise owned by black women with at least…” (Bid Document - Power Factor Correction - 2653GS.pdf, page 10)
- How to submit
In the tender box
“…011 490 7681 E-MAIL ADDRESS knnete@citypower.co.za SUBMISSION OF BIDS BIDS MUST BE SUBMITTED AT THE TENDER BOX SITUATED AT 40 HEREONMERE ROAD, REUVEN, BOOYSENS (Tender Advice Centre) (Please note that no e-mailed or faxed documents will be accepted) COMPULSORY MANDATORY REQUIREMENTS Tenderers should have a valid CIDB contractor grading of 7EP or Higher Provide valid…” (BID ADVERT - 2653GS - Power Factor Correction.docx, page 1)
- Bid validity
120 days after closing
“…telegraphic, telex, facsimile or e-mailed tender offers will not be accepted. F2.16 The tender offer is validity period is 120 days. F2.16.2 The tender must consider extending the validity period if requested by the Purchaser. F3.4 Tender offers/quotes will be opened by…” (Bid Document - Power Factor Correction - 2653GS.pdf, page 9)
- Contract period
60 months
“…Declarations D and E should be kept by the bidders for verification purposes for a period of at least 5 years. The successful bidder is required to continuously update Declarations C, D and E with the actual values for the duration of the contract.…” (Bid Document - Power Factor Correction - 2653GS.pdf, page 67)
- Documents the pack mentions
- CSD registration report (Bid Document - Power Factor Correction -, p. 2)
- Tax compliance status (SARS PIN) (Bid Document - Power Factor Correction -, p. 2)
- B-BBEE certificate or sworn affidavit (Bid Document - Power Factor Correction -, p. 2)
- CIDB registration certificate (Bid Document - Power Factor Correction -, p. 41)
- Municipal rates and taxes clearance (Bid Document - Power Factor Correction -, p. 72)
- Joint venture or consortium agreement (Bid Document - Power Factor Correction -, p. 16)
- Audited financial statements (Bid Document - Power Factor Correction -, p. 41)
- Reference letters from previous clients (Bid Document - Power Factor Correction -, p. 76)
- Professional registration (ECSA, SACQSP, SACPCMP or similar) (Bid Document - Power Factor Correction -, p. 76)
- Disqualification rules
- “ONLY FIRM PRICES WILL BE ACCEPTED, NON-FIRM PRICES (INCLUDING PRICES SUBJECT TO RATE OF EXCHANGE, VARIATION WILL NOT BE CONSIDERED) IN CASES WHERE DIFFERENT DELIVERY POINTS INFLUENCE THE PRICING, A SEPARATE PRICING SCHEDULE MUST BE SUBMITTED FOR EACH DELIVE…” (Bid Document - Power Factor Correction -, p. 23)
- “Failure to sign the quotation will invalidate the quotation” (Bid Document - Power Factor Correction -, p. 32)
- “Reference letters that are not confirmed by the client will not be considered” (Bid Document - Power Factor Correction -, p. 76)
Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.
Changes to this tender
New or amended document · noticed 01 Nov 2026
New document published: 14. CP_TSSPEC_053 REV 7 ACCESSORIES FOR MEDIUM VOLTAGE POWER CABLE FOR SYSTEMS WITH NOMINAL VOLTAGES OF 11KV TO 33KV_Signatures.pdf
New or amended document · noticed 21 Oct 2026
New document published: BID ADVERT - 2653GS - Power Factor Correction.pdf
New or amended document · noticed 21 Oct 2026
New document published: Bid Document - Power Factor Correction - 2653GS.pdf
My preparation
Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.
Sign in to save this tender, tick documents off and record your submission.
Documents to submit
General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.
Sign in to tick documents off and track your progress.
General guidance
Not part of this listing: what usually applies to South African public tenders.
Need money to deliver this? Tender and contract finance
Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.
Tender and contract financeHow to fund a contractGrants and programmes
If you win: payment terms, and the cash to carry
Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.
Description
From the official listing.
BID-2653GS: PROVISION OF POWER FACTOR CORRECTION AT CROWN SUBSTATION
Special conditions
COMPULSORY MANDATORY REQUIREMENTS 1. Tenderers should have a valid CIDB contractor grading of 7EP or Higher 2. Provide valid COIDA certificate from the Department of Labour or any other authorized relevant entities FUNCTIONALITY TOTAL SCORE: 100% 1ST STAGE OF BID EVALUATION 2ND STAGE OF BID EVALUATION THRESHOLD (MINIMUM SCORE): 90%
Contact person
KATLEGO NNETE
About this data
- Source
- National Treasury eTenders
- Freshness
- Not recently confirmed. The official source last confirmed this listing 24 Nov 2026, 16:54. It may have changed or been withdrawn: check the official page before relying on it.Last confirmed by eTenders on 24 Nov 2026, 16:54 (SAST). This page was generated on 28 Nov 2026, 12:41 (SAST). The status shown is only as current as the first of these.
- Official link
- Link not checked yet. We haven't checked that the official page opens.
- Open Contracting ID
- ocds-9t57fa-174971
- On eTenders
- Open the eTenders tender list and search for BID-2653GS. The official record is also available as raw data.
- Missing from the listing
- Estimated value: eTenders rarely publishes a value. We never estimate one.
Report a problem with this data
South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.