Skip to content
ZA NetworkGet started
Public tender · eTendersState-owned companyMpumalangaTender no. E3776GXMPGRO

Boiler inspections and plant failure investigations for maintenance and outage at Grootvlei Power Station for a period of 5 years on as and when required basis

ESKOM

Closes

In 48 days

Friday, 15 January 2027 at 10:00 SAST

Listed as open, but the official source has not confirmed it since 24 Nov 2026, 16:54 (SAST). It may have closed or changed: check the official page.

Add to calendar:Google (closing)Google (briefing)Apple or Outlook

Can you bid?

Confirmed for this tender:

CIDB grade 7 or higher · At least 70% on functionality

Next step

Read the requirements below, then check the official documents before you commit time.

Check against your business, free

Not recently confirmed. 15 official documents. Missing from the listing: estimated value.

In short

What they want
Boiler inspections and plant failure investigations for maintenance and outage at Grootvlei Power Station for a period of 5 years on as and when required basis.
What must be delivered
PAGE 6 C3.1 TSC3 SERVICE INFORMATION Boiler external inspection a. Inspect all boilers drain lines (super heater and water wall drains when the boiler is under pressure to identify any leaks). b. Inspect all buck stay areas for movements. c. Inspect wind box areas for steam or water leaks and ash build up. d. Inspect boiler wall corners for steam or water leaks, ash build up and sign of erosion or washing. e. Inspect all skin casings for water or steam leaks. Note: The relevant contractor must compile a preliminary report on all damage or loose shields, damage or loose flow distribution screens and ash build ups in the boiler.From C3 1 TSC3 Employers Service Information.pdf, page 6. Read the full scope in the documents.
How much and how long
5 years
Delivery address
N3 South, Between Heidelberg and Villiers., Grootvlei, Grootvlei, 2420
Who can bid
CIDB grade 7 or higher
How it's scored
  • You need at least 70% on functionality (quality) before price counts
  • Specific goals: Black ownership

A summary from the listing and the tender's documents. The official documents are the final word.

Key facts

Estimated value
Not published. We never estimate one.Work out your preference points
Industry
Engineering
Briefing session
Optional, 01 Dec 2026, 13:00MS Teams
CIDB grading
Grade 7 or higher
Functionality threshold
70%
Type
Request for quotation (RFQ)
Delivery location
N3 South, Between Heidelberg and Villiers., Grootvlei, Grootvlei, 2420
Published
30 Oct 2026

Can your business bid on this?

ZA Network guidance, not part of the official listing.

What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, Functionality threshold, RFQ
CSD (Central Supplier Database)
National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
Tax compliance status (SARS tax status, checked with a PIN)
SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
B-BBEE (Broad-Based Black Economic Empowerment)
A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
SBD forms (Standard Bidding Documents)
National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
CIDB (Construction Industry Development Board)
The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
Functionality threshold (The minimum quality score)
Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.
RFQ (Request for quotation)
A smaller purchase where the buyer asks for a price rather than a full bid: a shorter closing date, fewer forms, and usually a decision on price and preference points alone. The same compliance (CSD, tax) applies.

General explanations of South African public procurement, not this tender's requirements: the tender pack decides.

Check it against your business

Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.

No account needed. Your answers stay in this page's link and aren't stored.

Confirmed for this tender

  • CIDB grade 7 or higherRead from official document

    The tender asks for this grading or higher.

    Source: Invitation to Tender (ITT).pdf · page 13: “…service or service contract or an order issued in terms of such a contract; or b) a cidb grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract].…”

  • At least 70% on functionalityRead from official document

    Bids below the threshold aren't scored on price.

    Source: Invitation to Tender (ITT).pdf · page 8: “…Invitation to Tender/RFP will be deemed non-responsive. 3.13 Functionality requirements Functionality requirements are applicable The following criteria will be applicable for this transaction under functionality criteria: Criteria Weight Threshold 70% Tenderers who do not meet the threshold for functionality scoring will be disqualified 3.15 Evaluation of Price Prices will be evaluated as…”

Not confirmed

  • Tender documents reviewed: 14 / 15 relevant documentsNot confirmed

    1 document still needs review: Scope of work (6).pdf (scanned pages that can't be read automatically). Requirements in it aren't confirmed.

Check the official documents before you decide to bid.

Sign up to check your readiness

We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.

Where and how to submit

Submit electronically (online)

Must arrive before Friday, 15 January 2027 at 10:00 SAST. Late bids are never accepted.

“…Meeting ID: 360 844 178 886 202 1 Passcode: Pa9wQ2qW Tenders are to be submitted electronically via Eskom E- tendering site by the stipulated closing date and time. Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time https://tenderbulletin.eskom.co.za” (Invitation to Tender (ITT).pdf, page 1)

  • Register on the portal early and upload a day ahead: last-minute uploads fail. Save the submission confirmation.

ZA Network never submits bids for you. The tender documents are the final word on where and how.

Before you submit

Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified

  1. Sign every SBD form

    Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.

  2. Tax compliance status valid on the closing date

    Check it on SARS eFiling before 15 Jan 2027. A status that lapses before closing can cost you the award.

  3. CSD profile compliant, details matching

    Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.

  4. Proof for every point you claim

    Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.

  5. CIDB grade 7 or higher

    Active on the CIDB register on the closing date, or through a joint venture that meets the grade.

  6. Reach 70% on functionality

    Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for.

  7. The buyer's pricing schedule, complete

    Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.

  8. Every returnable schedule

    List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.

  9. Submit a day early

    Late bids aren't considered, even by a minute. Aim to submit by 14 Jan 2027, and check the address or upload method twice.

Official documents

Read from the official documents

What the tender documents say

Read by rules from 14 of 15 documents (1 couldn't be read: scanned pages, a format we can't read, or a download that failed; each one is marked under Official documents), 12 Nov 2026, 01:20. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.

CIDB grading

Grade 7 or higher

“…service or service contract or an order issued in terms of such a contract; or b) a cidb grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract].…” (Invitation to Tender (ITT).pdf, page 13)

Functionality threshold

Minimum 70% to be evaluated on price

“…Invitation to Tender/RFP will be deemed non-responsive. 3.13 Functionality requirements Functionality requirements are applicable The following criteria will be applicable for this transaction under functionality criteria: Criteria Weight Threshold 70% Tenderers who do not meet the threshold for functionality scoring will be disqualified 3.15 Evaluation of Price Prices will be evaluated as…” (Invitation to Tender (ITT).pdf, page 8)

Subcontracting required

At least 51% of the contract, to designated group

“…sub-contractor 7.7 Which designated group does the sub-contractor belong to: - a) An EME or QSE; b) An EME or QSE which is at least 51% owned by black people; c) An EME or QSE which is at least 51% owned by black people who are youth; d) An EME or QSE which is at least 51% owned by…” (Invitation to Tender (ITT).pdf, page 34)

Specific goals

Black ownership

“…relevant to your sector unless an entity is at least 51% Black owned you are required to obtain a Sworn affidavit. If your Annual Total Revenue is…” (SDL&I Strategy.pdf, page 3)

How to submit

Electronically (online)

“…Meeting ID: 360 844 178 886 202 1 Passcode: Pa9wQ2qW Tenders are to be submitted electronically via Eskom E- tendering site by the stipulated closing date and time. Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time https://tenderbulletin.eskom.co.za” (Invitation to Tender (ITT).pdf, page 1)

Bid validity

180 days after closing

“…E3776GXMPGR0 Issue date 30 October 2026 Closing date and time 15 January 2027 at 10h00 Tender validity period 180 days from the closing date and time Non-Compulsory Clarification meeting Date: 01 December 2026, Time: 13h00 – 15h00 Microsoft Teams meeting…” (Invitation to Tender (ITT).pdf, page 1)

Contract period

60 months

“…Plant failure investigations for maintenance and outage at Grootvlei Power Station for a period of 5 years on as and when required basis. The tender documents are supplied to you on the following basis: 1. Free of charge Eskom has delegated the…” (Invitation to Tender (ITT).pdf, page 2)

Documents the pack mentions
  • CSD registration report (Invitation to Tender (ITT).pdf, p. 10)
  • Tax compliance status (SARS PIN) (Invitation to Tender (ITT).pdf, p. 17)
  • B-BBEE certificate or sworn affidavit (Invitation to Tender (ITT).pdf, p. 14)
  • CIDB registration certificate (Invitation to Tender (ITT).pdf, p. 32)
  • COIDA letter of good standing (Invitation to Tender (ITT).pdf, p. 18)
  • Company registration documents (CIPC) (Invitation to Tender (ITT).pdf, p. 32)
  • Joint venture or consortium agreement (Invitation to Tender (ITT).pdf, p. 6)
  • Audited financial statements (Invitation to Tender (ITT).pdf, p. 22)
  • Professional registration (ECSA, SACQSP, SACPCMP or similar) (Invitation to Tender (ITT).pdf, p. 18)
  • Proof of briefing attendance (C3 1 TSC3 Employers Service Information., p. 12)
Disqualification rules
  • “Tenderers that do not attend such mandatory/compulsory meeting will be disqualified and will not be evaluated” (Invitation to Tender (ITT).pdf, p. 7)
  • “Criteria Weight Threshold 70% Tenderers who do not meet the threshold for functionality scoring will be disqualified 3” (Invitation to Tender (ITT).pdf, p. 8)
  • “If not fully completed, signed (if required on the returnable) and/or submitted by tender closing, the tenderer will be disqualified” (Invitation to Tender (ITT).pdf, p. 15)
  • “If the returnable is not fully completed, signed if required and/or received by the Procurement Practitioner within 5 working days of the request, the tenderer will be disqualified” (Invitation to Tender (ITT).pdf, p. 15)
  • “A [tender/proposal] will be disqualified if the tenderer/s, or any of its directors have: 1” (Invitation to Tender (ITT).pdf, p. 37)

Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.

Changes to this tender

  1. New or amended document · noticed 12 Nov 2026

    New document published: C3 1 TSC3 Employers Service Information.pdf

  2. New or amended document · noticed 12 Nov 2026

    New document published: SDL&I Strategy.pdf

  3. New or amended document · noticed 12 Nov 2026

    New document published: C1 1 TSC3 Offer Acceptance.pdf

  4. New or amended document · noticed 12 Nov 2026

    New document published: C0 TSC3 Contract cover pages.pdf

  5. New or amended document · noticed 12 Nov 2026

    New document published: C2 TSC3 Pricing Data Option A.pdf

  6. New or amended document · noticed 12 Nov 2026

    New document published: Scope of work (6).pdf

  7. New or amended document · noticed 12 Nov 2026

    New document published: C1 2b TSC3 Data by Contractor.pdf

  8. New or amended document · noticed 12 Nov 2026

    New document published: C1 2a TSC3 Data by Employer.pdf

  9. New or amended document · noticed 12 Nov 2026

    New document published: C1 2a TSC3 Data by Employer.pdf

  10. New or amended document · noticed 12 Nov 2026

    New document published: C1 2b TSC3 Data by Contractor.pdf

  11. New or amended document · noticed 12 Nov 2026

    New document published: C0 TSC3 Contract cover pages.pdf

  12. New or amended document · noticed 12 Nov 2026

    New document published: C2 TSC3 Pricing Data Option A.pdf

  13. New or amended document · noticed 12 Nov 2026

    New document published: C3 1 TSC3 Employers Service Information.pdf

  14. New or amended document · noticed 12 Nov 2026

    New document published: C1 1 TSC3 Offer Acceptance.pdf

My preparation

Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.

Sign in to save this tender, tick documents off and record your submission.

Documents to submit

General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.

Sign in to tick documents off and track your progress.

General guidance

Not part of this listing: what usually applies to South African public tenders.

Need money to deliver this? Tender and contract finance

Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.

Tender and contract financeHow to fund a contractGrants and programmes

If you win: payment terms, and the cash to carry

Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.

Description

From the official listing.

Boiler inspections and plant failure investigations for maintenance and outage at Grootvlei Power Station for a period of 5 years on as and when required basis.

Contact person

Michael Dube

dubemmi@eskom.co.za

017-779-8789

About this data

Source
National Treasury eTenders
Freshness
Not recently confirmed. The official source last confirmed this listing 24 Nov 2026, 16:54. It may have changed or been withdrawn: check the official page before relying on it.Last confirmed by eTenders on 24 Nov 2026, 16:54 (SAST). This page was generated on 28 Nov 2026, 12:42 (SAST). The status shown is only as current as the first of these.
Official link
Link not checked yet. We haven't checked that the official page opens.
Open Contracting ID
ocds-9t57fa-176519
On eTenders
Open the eTenders tender list and search for E3776GXMPGRO. The official record is also available as raw data.
Missing from the listing
  • Estimated value: eTenders rarely publishes a value. We never estimate one.

Report a problem with this data

South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.

The competition

179 past awards by this buyer.

See who won

Winners, repeat suppliers and their sizes are shown to signed-in accounts. Create a free account to see them.

Similar open tenders