Closes
In 13 days
Friday, 11 December 2026 at 10:00 SAST
Listed as open, but the official source has not confirmed it since 24 Nov 2026, 16:54 (SAST). It may have closed or changed: check the official page.
Add to calendar:GoogleApple or Outlook
Can you bid?
Confirmed for this tender:
CIDB grade 7 or higher
Next step
Read the requirements below, then check the official documents before you commit time.
Check against your business, freeNot recently confirmed. 54 official documents. Missing from the listing: estimated value.
In short
- What they want
- Draw, Fabricate, Supply, Deliver, Replace, and Install new pipework with fittings inside the cable tunnels and pipe trenches at Kriel Power Station for a period of six months
- What must be delivered
- We couldn't find the scope of work in the documents we read. Look for "scope of work", "specification" or "terms of reference" in the official documents.
- How much and how long
- 6 months
- Delivery address
- Kriel Power Station, Kriel, Kriel
- Who can bid
- CIDB grade 7 or higher
A summary from the listing and the tender's documents. The official documents are the final word.
Key facts
- Estimated value
- Not published. We never estimate one.Work out your preference points
- Industry
- Plumbing, Electrical, Manufacturing
- Briefing session
- Optional, 18 Jun 2026, 10:00MS Teams link in tender document
- CIDB grading
- Grade 7 or higher
- Functionality threshold
- Not stated in the listing. The tender document decides.
- Type
- Tender (request for bid)Published as “Request for Bid(Open-Tender)”
- Delivery location
- Kriel Power Station, Kriel, Kriel
- Published
- 02 Jun 2026
Can your business bid on this?
ZA Network guidance, not part of the official listing.
What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB
- CSD (Central Supplier Database)
- National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
- Tax compliance status (SARS tax status, checked with a PIN)
- SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
- B-BBEE (Broad-Based Black Economic Empowerment)
- A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
- SBD forms (Standard Bidding Documents)
- National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
- CIDB (Construction Industry Development Board)
- The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
General explanations of South African public procurement, not this tender's requirements: the tender pack decides.
Check it against your business
Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.
Confirmed for this tender
CIDB grade 7 or higherRead from official document
The tender asks for this grading or higher.
Source: NEC3 TSC_New Pipework.pdf · page 40: “…Manager 5.2.3 Limitations on subcontracting Subcontracting to contracts with required CIDB grading 5.2.4 Attendance on subcontractors None 5.3 Plant and Materials 5.3.1 Specifications Plant and Materials are defined as items intended to be…”
Not confirmed
Tender documents reviewed: 35 / 52 relevant documentsNot confirmed
17 documents still need review: Affidavit Example (1).pdf (scanned pages that can't be read automatically); ITT_CIDB Ann G Compulsory Enterprise Questionnaire.pdf (scanned pages that can't be read automatically); 0.45-61012-01 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM-SERVICES PUMP HOUSE.pdf (scanned pages that can't be read automatically); 0.45-61012-02 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM- SERVICES PUMP HOUSE TO CHEMICAL HOUSE.pdf (scanned pages that can't be read automatically); 0.45-61012-03 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM -CHEMICAL HOUSE TO UNIT 1.pdf (scanned pages that can't be read automatically); 0.45-61012-04 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM UNIT 1 TO 3.pdf (scanned pages that can't be read automatically); 0.45-61012-05 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM UNIT 4 TO 6.pdf (scanned pages that can't be read automatically); 0.45-61012-06 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM UNIT 6 TO CABLE TRENCH.pdf (scanned pages that can't be read automatically); 0.45-61011-01 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM RAW WATER PUMP HOUSE.pdf (scanned pages that can't be read automatically); 0.45-61011-02 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -RAW WATER TO EMULSIFIER PUMP HOUSE.pdf (scanned pages that can't be read automatically); 0.45-61011-03 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -RAW WATER TO EMULSIFIER PUMP HOUSE.pdf (scanned pages that can't be read automatically); 0.45-61011-04 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -RAW WATER TO EMULSIFIER PUMP HOUSE..pdf (scanned pages that can't be read automatically); 0.45-61011-05 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -CHEMICAL HOUSE TO BRIDGE.pdf (scanned pages that can't be read automatically); 0.45-61011-06 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -UNIT 1 TO 3.pdf (scanned pages that can't be read automatically); 0.45-61011-07 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -UNIT 1 TO 3.pdf (scanned pages that can't be read automatically); 0.45-61011-09 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -UNIT 6 TO CABLE TRENCH.pdf (scanned pages that can't be read automatically); 0.45-61010 - 01 FIRE PROTECTION SYSTEM HYDARNT & EMULSIFIER PLOT PLAN.pdf (scanned pages that can't be read automatically). Requirements in them aren't confirmed.
Check the official documents before you decide to bid.
We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.
Where and how to submit
Submit electronically (online)
Must arrive before Friday, 11 December 2026 at 10:00 SAST. Late bids are never accepted.
“…delivered to the following address on the stipulated closing date and time: E tenders' online submission Please take note of the following changes: Be on the lookout for updated document to be uploaded: • Revised NEC Contract • Revised Invitation to tender • Revised Scope of work Notification NR 3 (02.07.2026) – Tender Extension” (Notification NR 3 - Tender Extension.pdf, page 1)
- Tender documents (the submission details are in the bid document)
- Find it on eTenders: search for E2902GXMPKRI
- Ask Phumelele Mncwango: mncwanpj@eskom.co.za
- Register on the portal early and upload a day ahead: last-minute uploads fail. Save the submission confirmation.
- We found the method but not the address in the text we read: check the quoted page of the tender document.
ZA Network never submits bids for you. The tender documents are the final word on where and how.
Before you submit
Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified
Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.
Tax compliance status valid on the closing date
Check it on SARS eFiling before 11 Dec 2026. A status that lapses before closing can cost you the award.
CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.
Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.
CIDB grade 7 or higher
Active on the CIDB register on the closing date, or through a joint venture that meets the grade.
The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.
Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.
Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 10 Dec 2026, and check the address or upload method twice.
Official documents
- pdf240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf240-68099512 Form A_Cat 3_ Rev 9.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf240-105658000 Supplier Quality Management Specification.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf240-109253698 CQP Template 2021.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAffidavit Example (1).pdfFrom eTenders, 03 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdfAnnexure B.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfDraw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Technical Evaluation Strategy.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfEskom - Standard Conditions of Tender - 30 January 2025.pdfFrom eTenders, 03 Jun 2026General document: not read for this tender's own requirements.(opens in a new tab)
- pdfEskom_Supplier_Integrity_Pact_-_02_June_2023.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfITT_CIDB Ann G Compulsory Enterprise Questionnaire.pdfFrom eTenders, 03 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdfITT_CIDB SBD4 SCM_declaration_interest_SBD4_.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfITT_CIDB Standard Conditions of Tender Ann.pdfFrom eTenders, 03 Jun 2026General document: not read for this tender's own requirements.(opens in a new tab)
- pdfRER0371 - Environmental Evaluation - Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings inside the Cable Tunnels and Pipe Trenches.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfSafety file checklist.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfSHE Requirement (1).pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfSHE SPEC.pdfFrom eTenders, 03 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfNotification NR 1 - ITT and NEC uploaded.pdfFrom eTenders, 10 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfCONFIRMATION OF EMPLOYMENT EQUITY.pdfFrom eTenders, 10 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfNEC3 TSC_New Pipework.pdfFrom eTenders, 10 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfNotification NR 2 - Site Visit and PPE Requirements.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61012-01 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM-SERVICES PUMP HOUSE.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61012-02 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM- SERVICES PUMP HOUSE TO CHEMICAL HOUSE.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61012-03 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM -CHEMICAL HOUSE TO UNIT 1.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61012-04 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM UNIT 1 TO 3.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61012-05 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM UNIT 4 TO 6.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- zip0.45-61012-05 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM UNIT 4 TO 6.zipFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61012-06 FIRE PROTECTION SYSTEM EMULSIFIER FIRE SYSTEM UNIT 6 TO CABLE TRENCH.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61012-07-Emulsifier-Unit 6 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61012-08-Emulsifier-Unit 5 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61012-09-Emulsifier-Unit 4 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61012-10-Emulsifier-Unit 3 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61012-11-Emulsifier-Unit 2 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61012-12-Emulsifier-Unit 1 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61012-13-Emulsifier-Cable Tunnel-Bridge By Chemical House.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61011-01 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM RAW WATER PUMP HOUSE.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61011-02 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -RAW WATER TO EMULSIFIER PUMP HOUSE.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61011-03 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -RAW WATER TO EMULSIFIER PUMP HOUSE.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61011-04 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -RAW WATER TO EMULSIFIER PUMP HOUSE..pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61011-05 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -CHEMICAL HOUSE TO BRIDGE.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61011-06 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -UNIT 1 TO 3.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61011-07 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -UNIT 1 TO 3.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61011-09 FIRE PROTECTION SYSTEM HYDRANT FIRE SYSTEM -UNIT 6 TO CABLE TRENCH.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdf0.45-61011-10-Hydrant-Unit 6 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61011-11-Hydrant-Unit 5 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61011-12-Hydrant-Unit 4 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61011-13-Hydrant-Unit 3 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61011-14-Hydrant-Unit 2 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61011-15-Hydrant-Unit 1 Cable Tunnel.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61011-16-Hydrant-Cable Tunnel-Bridge By Chemical House.pdfFrom eTenders, 22 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf0.45-61010 - 01 FIRE PROTECTION SYSTEM HYDARNT & EMULSIFIER PLOT PLAN.pdfFrom eTenders, 22 Jun 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdfClarification NR 2 - Answers to clarification questions.pdfFrom eTenders, 25 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfClarification NR 2 - Answers to clarification questions.pdfFrom eTenders, 25 Jun 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfNotification NR 3 - Tender Extension.pdfFrom eTenders, 03 Jul 2026Read for this tender's requirements by our rules.(opens in a new tab)
Read from the official documents
What the tender documents say
Read by rules from 36 of 54 documents (18 couldn't be read: scanned pages, a format we can't read, or a download that failed; each one is marked under Official documents), 10 Oct 2026, 02:20. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.
- CIDB grading
Grade 5 or higher
“…Manager 5.2.3 Limitations on subcontracting Subcontracting to contracts with required CIDB grading 5.2.4 Attendance on subcontractors None 5.3 Plant and Materials 5.3.1 Specifications Plant and Materials are defined as items intended to be…” (NEC3 TSC_New Pipework.pdf, page 40)
- How to submit
Electronically (online)
“…delivered to the following address on the stipulated closing date and time: E tenders' online submission Please take note of the following changes: Be on the lookout for updated document to be uploaded: • Revised NEC Contract • Revised Invitation to tender • Revised Scope of work Notification NR 3 (02.07.2026) – Tender Extension” (Notification NR 3 - Tender Extension.pdf, page 1)
- Bid validity
90 days after closing
“…Tender number E2902GXMPKRI Issue date 02 June 2026 Closing Date 28 August 2026 at 10h00 Tender validity period 90 days from the closing date and time Tenders are to be delivered to the following address on the stipulated closing date and time: E tenders'…” (Notification NR 3 - Tender Extension.pdf, page 1)
- Contract period
6 months
“…if there are any identified repeat nonconformities from the same supplier within a period of 6 months or less. This must then be escalated to the management review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not…” (240-105658000 Supplier Quality Management Specification.pdf, page 26)
- Documents the pack mentions
- Proof of briefing attendance (240-105658000 Supplier Quality Managemen, p. 14)
- COIDA letter of good standing (SHE Requirement (1).pdf, p. 2)
- Professional registration (ECSA, SACQSP, SACPCMP or similar) (Draw Fabricate Supply Deliver Replace an, p. 6)
- CIDB registration certificate (NEC3 TSC_New Pipework.pdf, p. 3)
- CSD registration report (Eskom - Standard Conditions of Tender - , p. 10)
- B-BBEE certificate or sworn affidavit (Eskom - Standard Conditions of Tender - , p. 7)
- Disqualification rules
- “ified Trade Test Certificate 4 = Submitted 3 Certified Trade Test Certificate 2 = Submitted 2 Certified Trade Test Certificate 0 = Not submitted or submitted 1 Certified Trade Test Certificate * Uncertified certificates will not be considered 25% 1” (Draw Fabricate Supply Deliver Replace an, p. 6)
- “lace, and Install New Pipework with Fittings inside the Cable Tunnels and Pipe Trenches – Tender Technical Evaluation Strategy 0 = Not submitted or submitted 1 Certified Trade Test Certificate * Uncertified certificates will not be considered 2” (Draw Fabricate Supply Deliver Replace an, p. 7)
- “ISO 3834 Part 1, 3, and 4 will not be considered” (Draw Fabricate Supply Deliver Replace an, p. 10)
- “Tenderers that Eskom finds to be ineligible will be disqualified” (Eskom - Standard Conditions of Tender - , p. 2)
- “Any tender that is based on 100% sub-contracting will be deemed ineligible and will be disqualified” (Eskom - Standard Conditions of Tender - , p. 2)
- “If an original tender is not submitted at all, or a copy of the original tender is not submitted at all, the tenderer will be disqualified” (Eskom - Standard Conditions of Tender - , p. 3)
- “Failure to attend a clarification meeting or site visit that is identified as compulsory will result in disqualification from participation” (Eskom - Standard Conditions of Tender - , p. 4)
- “the tender will be disqualified” (Eskom - Standard Conditions of Tender - , p. 6)
- “If the SDL&I Undertaking is not completed and submitted as indicated in the Invitation to Tender, the tender will not be considered for contract award” (Eskom - Standard Conditions of Tender - , p. 7)
- “A tender that does not contain the mandatory documents or information stipulated in the Invitation to Tender by the required closing date and time for tender submission will be disqualified from further evaluation” (Eskom - Standard Conditions of Tender - , p. 9)
Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.
Changes to this tender
Closing date changed · noticed 24 Nov 2026
12 Oct 2026, 10:00 → 11 Dec 2026, 10:00
My preparation
Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.
Sign in to save this tender, tick documents off and record your submission.
Documents to submit
General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.
Sign in to tick documents off and track your progress.
General guidance
Not part of this listing: what usually applies to South African public tenders.
Need money to deliver this? Tender and contract finance
Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.
Tender and contract financeHow to fund a contractGrants and programmes
If you win: payment terms, and the cash to carry
Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.
Description
From the official listing.
Draw, Fabricate, Supply, Deliver, Replace, and Install new pipework with fittings inside the cable tunnels and pipe trenches at Kriel Power Station for a period of six months
Contact person
Phumelele Mncwango
About this data
- Source
- National Treasury eTenders
- Freshness
- Not recently confirmed. The official source last confirmed this listing 24 Nov 2026, 16:54. It may have changed or been withdrawn: check the official page before relying on it.Last confirmed by eTenders on 24 Nov 2026, 16:54 (SAST). This page was generated on 28 Nov 2026, 13:09 (SAST). The status shown is only as current as the first of these.
- Official link
- Link not checked yet. We haven't checked that the official page opens.
- Open Contracting ID
- ocds-9t57fa-158048
- On eTenders
- Open the eTenders tender list and search for E2902GXMPKRI. The official record is also available as raw data.
- Missing from the listing
- Estimated value: eTenders rarely publishes a value. We never estimate one.
Report a problem with this data
South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.