Closes
In 6 days
Friday, 4 December 2026 at 12:00 SAST
Listed as open, but the official source has not confirmed it since 24 Nov 2026, 16:54 (SAST). It may have closed or changed: check the official page.
Closing soon. Aim to submit a day early, by 03 Dec 2026: late bids aren't considered.
Add to calendar:GoogleApple or Outlook
Can you bid?
Confirmed for this tender:
Reserved for QSEs · At least 90% on functionality
Next step
Read the requirements below, then check the official documents before you commit time.
Check against your business, freeNot recently confirmed. 28 official documents. Missing from the listing: estimated value.
In short
- What they want
- For the provisioning of hardware, architecture, designing, purchase and software of infrastructure for transnet port terminals (tpt), transnet national ports authority (tnpa) and transnet corporate centre (tcc) for a period of five (05) years
- What must be delivered
- "To be" Regional Cloud Datacentre Architecture Bidders are required to add onto the current solution based on cloud architecture as per Figure 1 above, which enables unified management and deployment of the data centre to ensure its consistency and scalability throughout the Transnet landscape. Figure 2 : To be High Le ve l HCS D at ac e ntre Arc hitec ture Transnet is considering executing the whole project in multiple phases according to the specific circumstances of the investment. Ideally, the main regional data centre in Pretoria Johannesburg, Durban and Cape Town, will be implemented in the first phase and the rest of the regional data centres will be implemented afterwards.From Addendum 2 RFP - Consolidated Infrastructure.pdf, page 41. Read the full scope in the documents.
- How much and how long
- 5 years
- Delivery address
- 150 Commissioner Street, Johannesburg, Johannesburg, 2001
- Who can bid
- Set aside for QSE businesses
- How it's scored
- You need at least 90% on functionality (quality) before price counts
- Specific goals: Black ownership
A summary from the listing and the tender's documents. The official documents are the final word.
Key facts
- Estimated value
- Not published. We never estimate one.Work out your preference points
- Industry
- IT and software
- Briefing session
- Optional
- CIDB grading
- Not stated in the listing
- Functionality threshold
- 90%
- Type
- Request for proposal (RFP)
- Delivery location
- 150 Commissioner Street, Johannesburg, Johannesburg, 2001
- Published
- 23 Sept 2026
Can your business bid on this?
ZA Network guidance, not part of the official listing.
What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, Set-aside (EME, QSE), Functionality threshold
- CSD (Central Supplier Database)
- National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
- Tax compliance status (SARS tax status, checked with a PIN)
- SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
- B-BBEE (Broad-Based Black Economic Empowerment)
- A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
- SBD forms (Standard Bidding Documents)
- National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
- Set-aside (EME, QSE) (Reserved for businesses of a size)
- An EME (exempted micro enterprise) has a yearly turnover of R10 million or less; a QSE (qualifying small enterprise) between R10 million and R50 million. A tender set aside for them accepts only businesses of that size as the main bidder, shown by a sworn affidavit.
- Functionality threshold (The minimum quality score)
- Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.
General explanations of South African public procurement, not this tender's requirements: the tender pack decides.
Check it against your business
Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.
Confirmed for this tender
Reserved for QSEsRead from official document
Only these business sizes may bid as the main contractor.
Source: Addendum 1 RFP - Consolidated Infrastructure.pdf · page 105: “…and attested by a Commissioner of Oaths confirming annual turnover and black ownership (only black- owned QSEs - 51% to 100% Black owned) [Sworn affidavits must substantially comply with the format that can be obtained on the DTI's website at…”
At least 90% on functionalityRead from official document
Bids below the threshold aren't scored on price.
Source: Annexure G Service Level Requirements.pdf · page 24: “…• Achieve a minimum defect closure rate of 95% prior to production cutover or go-live. Quality Metrics: • Achieve a minimum UAT first-time pass rate of 90%. • Post implementation defect rate shall not exceed 2% of implemented deliverables. • Root Cause Analysis shall be completed for recurring…”
We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.
Where and how to submit
Submit electronically (online)
Must arrive before Friday, 4 December 2026 at 12:00 SAST. Late bids are never accepted.
“…Midday BID VALIDITY PERIOD: 180 Business Days from Closing Date SUBMISSION TO: Transnet e-tender submission portal – see SBD 1 for details Technical pre-qualification: No. Requirements Provide Evidence /Supporting Documents And Include As An Appendix To This Annexure And Indicate Reference Hereunder 1 The bidder must submit valid proof of accreditation,…” (Addendum 1 RFP - Consolidated Infrastructure.pdf, page 1)
- Submit on the eTenders portal
- Tender documents (the submission details are in the bid document)
- Find it on eTenders: search for TCC/2026/03/0029/2277/RFP
- Ask Reetsang Modise: Reetsang.Modise@transnet.net
- Register on the portal early and upload a day ahead: last-minute uploads fail. Save the submission confirmation.
ZA Network never submits bids for you. The tender documents are the final word on where and how.
Before you submit
Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified
Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.
Tax compliance status valid on the closing date
Check it on SARS eFiling before 04 Dec 2026. A status that lapses before closing can cost you the award.
CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.
Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.
Proof you're an QSE
This tender is reserved. Include the affidavit or certificate that shows your business size.
Reach 90% on functionality
Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for.
The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.
Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.
Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 03 Dec 2026, and check the address or upload method twice.
Official documents
- xlsxAnnexure C TCC DC and RDCRefresh Pricing Workbook - Final.xlsxFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAnnexure A TPT Pricing Workbook - Final.xlsxFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAnnexure B TNPA Pricing Workbook.xlsxFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAnnexure C TCC DC and RDCRefresh Pricing Workbook - Final.xlsxFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAnnexure D Consolidated Summary Infrastructure Refresh.xlsxFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAnnexure E Consolidated Technical Evaluation Criteria.xlsxFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure F Draft Master Agreement Services.pdfFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure G Service Level Requirements.pdfFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure H Service Credits.pdfFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure I Non Disclosure Agreement.pdfFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure J Supplier Integrity Pact.pdfFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure K Transnet General Bid Conditions.pdfFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure L Supplier Declaration Form.pdfFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfRFP - Consolidated Infrastructure.pdfFrom eTenders, 23 Sept 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfMinutes Briefing session Consolidated Infrastructure.pdfFrom eTenders, 14 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfPresentation Non-Compulsory Briefing Session Consolidated Infrastructure.pdfFrom eTenders, 14 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxResponse to 23 DR Site TNPA.xlsxFrom eTenders, 23 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfResponse to 23 Commvault Core.pdfFrom eTenders, 23 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxResponse to 23 Copy of TNPA Private Cloud Equipment Capitalisation (003).xlsxFrom eTenders, 23 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxResponse to 23 QWH Primary TNPA.xlsxFrom eTenders, 23 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfBatch 1 Clarification Questions Transnet Responses.pdfFrom eTenders, 23 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAddendum 1 RFP - Consolidated Infrastructure.pdfFrom eTenders, 28 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAddendum 1 Annexure A TPT Pricing Workbook.xlsxFrom eTenders, 20 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAddendum 1 Annexure B TNPA Pricing Workbook.xlsxFrom eTenders, 20 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAddendum 1 Annexure C TCC DC and RDC Infrastructure Refresh.xlsxFrom eTenders, 20 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsxAddendum 1 Annexure D Consolidated Summary Infrastruct.xlsxFrom eTenders, 20 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAddendum 2 RFP - Consolidated Infrastructure.pdfFrom eTenders, 20 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfBatch 2 Clarification Questions Transnet Responses.pdfFrom eTenders, 20 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
Read from the official documents
What the tender documents say
Read by rules from 28 of 28 documents, 24 Nov 2026, 19:20. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.
- Functionality threshold
Minimum 90% to be evaluated on price
“…• Achieve a minimum defect closure rate of 95% prior to production cutover or go-live. Quality Metrics: • Achieve a minimum UAT first-time pass rate of 90%. • Post implementation defect rate shall not exceed 2% of implemented deliverables. • Root Cause Analysis shall be completed for recurring…” (Annexure G Service Level Requirements.pdf, page 24)
- Reserved for
QSEs only
“…and attested by a Commissioner of Oaths confirming annual turnover and black ownership (only black- owned QSEs - 51% to 100% Black owned) [Sworn affidavits must substantially comply with the format that can be obtained on the DTI's website at…” (Addendum 1 RFP - Consolidated Infrastructure.pdf, page 105)
- Subcontracting required
At least 30% of the contract
“…Subcontracting 4.3 The bidder will be required to sub-contract a minimum of 30% of the total value of the contract. 4.4 The successful bidder(s) will be required to meet the…” (Addendum 1 RFP - Consolidated Infrastructure.pdf, page 11)
- Specific goals
Black ownership
“…2 3 30% subcontracting to EMEs and or QSEs that are 51% Black Owned 7 Total points for Price and Specific Goals must not exceed 100 1.5 Failure on…” (Addendum 1 RFP - Consolidated Infrastructure.pdf, page 103)
- How to submit
Electronically (online)
“…Midday BID VALIDITY PERIOD: 180 Business Days from Closing Date SUBMISSION TO: Transnet e-tender submission portal – see SBD 1 for details Technical pre-qualification: No. Requirements Provide Evidence /Supporting Documents And Include As An Appendix To This Annexure And Indicate Reference Hereunder 1 The bidder must submit valid proof of accreditation,…” (Addendum 1 RFP - Consolidated Infrastructure.pdf, page 1)
- Contract period
60 months
“…TRANSNET NATIONAL PORTS AUTHORITY (TNPA) AND TRANSNET CORPORATE CENTRE (TCC) FOR A PERIOD OF FIVE (05) YEARS RFP NUMBER TCC/2026/03/0029/2277/RFP ISSUE DATE: 23 September 2026 CLOSING DATE: 27 November 2026 CLOSING TIME: 12:00 Midday BID VALIDITY…” (Addendum 1 RFP - Consolidated Infrastructure.pdf, page 1)
- Documents the pack mentions
- Tax compliance status (SARS PIN) (Addendum 1 RFP - Consolidated Infrastruc, p. 6)
- B-BBEE certificate or sworn affidavit (Addendum 1 RFP - Consolidated Infrastruc, p. 6)
- Company registration documents (CIPC) (Addendum 1 RFP - Consolidated Infrastruc, p. 104)
- Joint venture or consortium agreement (Addendum 1 RFP - Consolidated Infrastruc, p. 11)
- Audited financial statements (Addendum 1 RFP - Consolidated Infrastruc, p. 13)
- Proof of briefing attendance (Batch 1 Clarification Questions Transnet, p. 6)
- Reference letters from previous clients (Batch 1 Clarification Questions Transnet, p. 9)
- Disqualification rules
- “Respondents are to note that changes to its submission will not be considered after the closing date” (Addendum 1 RFP - Consolidated Infrastruc, p. 12)
- “Failure to do so will result in disqualification” (Addendum 1 RFP - Consolidated Infrastruc, p. 84)
- “c) Any disbursement not specifically priced for will not be considered/accepted by Transnet” (Addendum 1 RFP - Consolidated Infrastruc, p. 84)
- “The bidder understands that his/her Bid will be disqualified if the Certificate of Acquaintance with RFP documents included in the RFP as a returnable document, is found not to be true and complete in every respect” (Addendum 1 RFP - Consolidated Infrastruc, p. 96)
- “It is therefore mandatory for bidders to bid for ALL four (4) parts of the scope, and submissions that address less than four (4) parts will be deemed non- responsive and will be disqualified from further consideration” (Addendum 2 RFP - Consolidated Infrastruc, p. 2)
- “It is therefore mandatory for bidders to bid for ALL four (4) parts of the scope, and submissions that address less than four (4) parts will be deemed non-responsive and will be disqualified from further consideration 3 Formula errors in the protected prici…” (Batch 2 Clarification Questions Transnet, p. 1)
- “Reetsang Modise • Bidders were advice that if the Mandatory returnable Documents are not fully completed and submitted at the closing date and time of the RFP, they will be disqualified” (Minutes Briefing session Consolidated In, p. 3)
- “Late Bids will not be considered” (Annexure K Transnet General Bid Conditio, p. 3)
- “Failure to submit mandatory returnable schedules / documents will result in disqualification” (Annexure K Transnet General Bid Conditio, p. 4)
- “PRICES SUBJECT TO CONFIRMATION Prices which are quoted subject to confirmation will not be considered” (Annexure K Transnet General Bid Conditio, p. 5)
Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.
Changes to this tender
New or amended document · noticed 24 Nov 2026
New document published: Addendum 1 Annexure C TCC DC and RDC Infrastructure Refresh.xlsx
New or amended document · noticed 24 Nov 2026
New document published: Batch 2 Clarification Questions Transnet Responses.pdf
New or amended document · noticed 24 Nov 2026
New document published: Addendum 2 RFP - Consolidated Infrastructure.pdf
New or amended document · noticed 24 Nov 2026
New document published: Addendum 1 Annexure B TNPA Pricing Workbook.xlsx
New or amended document · noticed 24 Nov 2026
New document published: Addendum 1 Annexure D Consolidated Summary Infrastruct.xlsx
New or amended document · noticed 24 Nov 2026
New document published: Addendum 1 RFP - Consolidated Infrastructure.pdf
New or amended document · noticed 24 Nov 2026
New document published: Response to 23 DR Site TNPA.xlsx
New or amended document · noticed 24 Nov 2026
New document published: Addendum 1 Annexure A TPT Pricing Workbook.xlsx
New or amended document · noticed 24 Nov 2026
New document published: Response to 23 Copy of TNPA Private Cloud Equipment Capitalisation (003).xlsx
New or amended document · noticed 24 Nov 2026
New document published: Response to 23 Commvault Core.pdf
New or amended document · noticed 24 Nov 2026
New document published: Response to 23 QWH Primary TNPA.xlsx
New or amended document · noticed 24 Nov 2026
New document published: Batch 1 Clarification Questions Transnet Responses.pdf
Closing date changed · noticed 24 Nov 2026
28 Oct 2026, 12:00 → 04 Dec 2026, 12:00
New or amended document · noticed 22 Oct 2026
New document published: Presentation Non-Compulsory Briefing Session Consolidated Infrastructure.pdf
New or amended document · noticed 22 Oct 2026
New document published: Minutes Briefing session Consolidated Infrastructure.pdf
New or amended document · noticed 28 Sept 2026
New document published: Annexure C TCC DC and RDCRefresh Pricing Workbook - Final.xlsx
New or amended document · noticed 28 Sept 2026
New document published: Annexure K Transnet General Bid Conditions.pdf
New or amended document · noticed 28 Sept 2026
New document published: Annexure I Non Disclosure Agreement.pdf
New or amended document · noticed 28 Sept 2026
New document published: Annexure L Supplier Declaration Form.pdf
New or amended document · noticed 28 Sept 2026
New document published: Annexure E Consolidated Technical Evaluation Criteria.xlsx
New or amended document · noticed 28 Sept 2026
New document published: Annexure F Draft Master Agreement Services.pdf
New or amended document · noticed 28 Sept 2026
New document published: Annexure H Service Credits.pdf
New or amended document · noticed 28 Sept 2026
New document published: Annexure B TNPA Pricing Workbook.xlsx
New or amended document · noticed 28 Sept 2026
New document published: Annexure A TPT Pricing Workbook - Final.xlsx
New or amended document · noticed 28 Sept 2026
New document published: Annexure G Service Level Requirements.pdf
New or amended document · noticed 28 Sept 2026
New document published: RFP - Consolidated Infrastructure.pdf
New or amended document · noticed 28 Sept 2026
New document published: Annexure D Consolidated Summary Infrastructure Refresh.xlsx
New or amended document · noticed 28 Sept 2026
New document published: Annexure J Supplier Integrity Pact.pdf
My preparation
Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.
Sign in to save this tender, tick documents off and record your submission.
Documents to submit
General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.
Sign in to tick documents off and track your progress.
Price the buyer's schedule
The pricing schedule lists 11 items (Addendum 1 Annexure B TNPA Pricing Workbook.xlsx › Services). We've copied the items and quantities into the bid price calculator: add your prices to see the total, VAT and the lowest you can go.
General guidance
Not part of this listing: what usually applies to South African public tenders.
Need money to deliver this? Tender and contract finance
Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.
Tender and contract financeHow to fund a contractGrants and programmes
If you win: payment terms, and the cash to carry
Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.
Description
From the official listing.
FOR THE PROVISIONING OF HARDWARE, ARCHITECTURE, DESIGNING, PURCHASE AND SOFTWARE OF INFRASTRUCTURE FOR TRANSNET PORT TERMINALS (TPT), TRANSNET NATIONAL PORTS AUTHORITY (TNPA) AND TRANSNET CORPORATE CENTRE (TCC) FOR A PERIOD OF FIVE (05) YEARS
Contact person
Reetsang Modise
About this data
- Source
- National Treasury eTenders
- Freshness
- Not recently confirmed. The official source last confirmed this listing 24 Nov 2026, 16:54. It may have changed or been withdrawn: check the official page before relying on it.Last confirmed by eTenders on 24 Nov 2026, 16:54 (SAST). This page was generated on 28 Nov 2026, 12:10 (SAST). The status shown is only as current as the first of these.
- Official link
- Link not checked yet. We haven't checked that the official page opens.
- Open Contracting ID
- ocds-9t57fa-171574
- On eTenders
- Open the eTenders tender list and search for TCC/2026/03/0029/2277/RFP. The official record is also available as raw data.
- Missing from the listing
- Estimated value: eTenders rarely publishes a value. We never estimate one.
Report a problem with this data
South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.