Skip to content
ZA NetworkGet started
Public tender · eTendersMunicipal governmentWestern CapeTender no. GMQ007/26-27

GMQ007/26-27 – Supply, Replacement and Installation of New Mid-Wall Airconditioning & Related Works for the Corporate Services Directorate of George…

George Municipality

Closes

In 6 days

Friday, 4 December 2026 at 12:00 SAST

Closing soon. Aim to submit a day early, by 03 Dec 2026: late bids aren't considered.

Add to calendar:GoogleApple or Outlook

Can you bid?

Confirmed for this tender:

CIDB grade 1ME or higher · Compulsory briefing (already held)

Next step

Read the requirements below, then check the official documents before you commit time.

Check against your business, free

Last checked 27 Nov 2026, 02:37. 3 official documents. Missing from the listing: estimated value.

In short

What they want
GMQ007/26-27 – Supply, Replacement and Installation of New Mid-Wall Airconditioning & Related Works for the Corporate Services Directorate of George Municipality, As and When Required from Date of Appointment until 30 June 2027
What must be delivered
Part C3 Quotation GMQ007/26-27, Page 75 • Bidders must Measure all sizes at the site meeting and before commencement of the project. • Once the required work has been performed, the site must be clean and pristine, prior to handing it back to George Municipality. • An alternative bidder may be appointed. • The quantities indicated are purely for evaluation purposes. Final quantities will reflect on the official order, as and when required, with the contract amount not exceeding the budgeted amount and formal quotation threshold amount of R300,000.00 (VAT Included).From Quote GMQ007 of 26-27 - Supply Replacement and Installation of new Midwall Aircon.pdf, page 75. Read the full scope in the documents.
How much and how long
5 years
Delivery address
Mission Street, Pacaltsdorp, George, 6529
Who can bid
CIDB grade 1ME or higher · Attended the compulsory briefing

A summary from the listing and the tender's documents. The official documents are the final word.

Key facts

Estimated value
Not published. We never estimate one.Work out your preference points
Industry
Electrical
Briefing session
Compulsory, 26 Nov 2026, 11:00Pacaltsdorp Community Hall. 47 Mission Street, Pacaltsdorp, George, 6529.
CIDB grading
Grade 1ME or higher
Functionality threshold
Not stated in the listing. The tender document decides.
Type
Request for quotation (RFQ)
Delivery location
Mission Street, Pacaltsdorp, George, 6529
Published
18 Nov 2026

Can your business bid on this?

ZA Network guidance, not part of the official listing.

What these terms mean: CSD, Tax compliance status, B-BBEE, MBD forms, CIDB, Compulsory briefing, RFQ
CSD (Central Supplier Database)
National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
Tax compliance status (SARS tax status, checked with a PIN)
SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
B-BBEE (Broad-Based Black Economic Empowerment)
A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
MBD forms (Municipal Bidding Documents)
The municipal version of the standard forms, in every municipal tender pack: MBD 1, 3.1, 4, 6.1, 8 and 9. Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
CIDB (Construction Industry Development Board)
The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
Compulsory briefing (A compulsory site meeting or clarification session)
A meeting the buyer holds before closing, at the site or online. When it is compulsory, a bidder who did not attend and sign the register is disqualified, whatever the bid says.
RFQ (Request for quotation)
A smaller purchase where the buyer asks for a price rather than a full bid: a shorter closing date, fewer forms, and usually a decision on price and preference points alone. The same compliance (CSD, tax) applies.

General explanations of South African public procurement, not this tender's requirements: the tender pack decides.

Check it against your business

Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.

No account needed. Your answers stay in this page's link and aren't stored.

Confirmed for this tender

  • CIDB grade 1ME or higherRead from official document

    The tender asks for this grading or higher.

    Source: Quote GMQ007 of 26-27 - Supply Replacement and Installation of new Midwall Aircon.pdf · page 6: “…nie bygewoon word nie, sal u kwotasie gediskwalifiseer word. Bieërs moet by die CIDB geregistreer wees en dit word geraam dat bieërs 'n graderingsvlak van 1ME of hoër moet hê. Kwotasie dokumente is verkrygbaar teen 'n R70.15 nie-terugbetaalbare deposito by die Quotations are hereby invited for the…”

  • Compulsory briefing (already held)Stated in listing

    Bidders who don't attend are disqualified.

    Source: the official listing

Sign up to check your readiness

We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.

Where and how to submit

Deliver to the tender box

Must arrive before Friday, 4 December 2026 at 12:00 SAST. Late bids are never accepted.

“…quotations in a sealed envelope, clearly marked: Quotation No.: GMQ007/26-27 must be placed in the tender box at the George Municipality on the Fifth Floor, DIRECTORATE: FINANCIAL SERVICES, Supply Chain Management Unit, Civic Centre, York Street, George by no later than 12:00 on Friday, 04 December 2026. Quotations are not allowed to be placed in the tender box after…” (Quote GMQ007 of 26-27 - Supply Replacement and Installation of new Midwall Aircon.pdf, page 6)

  • Deliver it by hand or courier before the closing time, in a sealed envelope marked with the bid number. Late bids are not accepted.

ZA Network never submits bids for you. The tender documents are the final word on where and how.

Before you submit

Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified

  1. Sign every MBD form

    Usually MBD 1, MBD 3.1, MBD 4, MBD 6.1, MBD 8 and MBD 9, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.

  2. Tax compliance status valid on the closing date

    Check it on SARS eFiling before 04 Dec 2026. A status that lapses before closing can cost you the award.

  3. CSD profile compliant, details matching

    Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.

  4. Proof for every point you claim

    Your B-BBEE affidavit or certificate, and anything else the MBD 6.1 asks for, must support the specific-goal points you claim.

  5. Briefing attendance certificate

    Include proof that you attended the compulsory briefing. Bidders who missed it are disqualified.

  6. CIDB grade 1ME or higher

    Active on the CIDB register on the closing date, or through a joint venture that meets the grade.

  7. The buyer's pricing schedule, complete

    Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.

  8. Every returnable schedule

    List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.

  9. Submit a day early

    Late bids aren't considered, even by a minute. Aim to submit by 03 Dec 2026, and check the address or upload method twice.

Official documents

Read from the official documents

What the tender documents say

Read by rules from 3 of 3 documents, 18 Nov 2026, 12:20. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.

CIDB grading

Grade 1ME or higher

“…nie bygewoon word nie, sal u kwotasie gediskwalifiseer word. Bieërs moet by die CIDB geregistreer wees en dit word geraam dat bieërs 'n graderingsvlak van 1ME of hoër moet hê. Kwotasie dokumente is verkrygbaar teen 'n R70.15 nie-terugbetaalbare deposito by die Quotations are hereby invited for the…” (Quote GMQ007 of 26-27 - Supply Replacement and Installation of new Midwall Aircon.pdf, page 6)

How to submit

In the tender box

“…quotations in a sealed envelope, clearly marked: Quotation No.: GMQ007/26-27 must be placed in the tender box at the George Municipality on the Fifth Floor, DIRECTORATE: FINANCIAL SERVICES, Supply Chain Management Unit, Civic Centre, York Street, George by no later than 12:00 on Friday, 04 December 2026. Quotations are not allowed to be placed in the tender box after…” (Quote GMQ007 of 26-27 - Supply Replacement and Installation of new Midwall Aircon.pdf, page 6)

Bid validity

84 days after closing

“…tender apply equally to the extended deadline. C.2.16 Tender offer validity C.2.16.1 The quotation offer validity period is 84 days. C.2.16.2 If requested by the employer, consider extending the validity period stated in the tender data for an agreed additional period…” (Quote GMQ007 of 26-27 - Supply Replacement and Installation of new Midwall Aircon.pdf, page 13)

Contract period

60 months

“…shareholders and directors on obtaining any business from the George Municipality for a period of 5 years.” (Quote GMQ007 of 26-27 - Supply Replacement and Installation of new Midwall Aircon.pdf, page 59)

Documents the pack mentions
  • Tax compliance status (SARS PIN) (Quote GMQ007 of 26-27 - Supply Replaceme, p. 7)
  • B-BBEE certificate or sworn affidavit (Quote GMQ007 of 26-27 - Supply Replaceme, p. 1)
  • Municipal rates and taxes clearance (Quote GMQ007 of 26-27 - Supply Replaceme, p. 30)
  • Joint venture or consortium agreement (Quote GMQ007 of 26-27 - Supply Replaceme, p. 14)
  • Public liability insurance (Quote GMQ007 of 26-27 - Supply Replaceme, p. 59)
Disqualification rules
  • “Late or unmarked quotations will not be considered” (Quote GMQ007 of 26-27 - Supply Replaceme, p. 6)
  • “If the Joint Venture Agreement is not attached, the tender will not be considered! DETAILS OF PROPRIETOR, PARTNERS, CLOSED CORPORATION MEMBERS OR COMPANY DIRECTORS Name and Identity Number Relevant qualifications and experience Years of rele” (Quote GMQ007 of 26-27 - Supply Replaceme, p. 44)
  • “If bidders do not quote as mentioned above, your quotation will not be considered for evaluation” (Quote GMQ007 of 26-27 - Supply Replaceme, p. 74)

Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.

My preparation

Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.

Sign in to save this tender, tick documents off and record your submission.

Documents to submit

General guidance: municipal tenders usually ask for MBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.

Sign in to tick documents off and track your progress.

General guidance

Not part of this listing: what usually applies to South African public tenders.

Need money to deliver this? Tender and contract finance

Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.

Tender and contract financeHow to fund a contractGrants and programmes

If you win: payment terms, and the cash to carry

Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.

Description

From the official listing.

GMQ007/26-27 – Supply, Replacement and Installation of New Mid-Wall Airconditioning & Related Works for the Corporate Services Directorate of George Municipality, As and When Required from Date of Appointment until 30 June 2027

Contact person

Xolani Henge

xwhenge@george.gov.za

044-801-9005

About this data

Source
National Treasury eTenders
Freshness
Last checked 27 Nov 2026, 02:37. The official source last confirmed this listing 27 Nov 2026, 02:37. Check the official page for late changes.Last confirmed by eTenders on 27 Nov 2026, 02:37 (SAST). This page was generated on 28 Nov 2026, 12:57 (SAST). The status shown is only as current as the first of these.
Official link
Link not checked yet. We haven't checked that the official page opens.
Open Contracting ID
ocds-9t57fa-178645
On eTenders
Open the eTenders tender list and search for GMQ007/26-27. The official record is also available as raw data.
Missing from the listing
  • Estimated value: eTenders rarely publishes a value. We never estimate one.

Report a problem with this data

South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.

The competition

14 past awards by this buyer.

See who won

Winners, repeat suppliers and their sizes are shown to signed-in accounts. Create a free account to see them.

Similar open tenders

  1. State-owned companyTender (request for bid)KwaZulu-Natal

    Appointment for a panel of service providers on an as and when basis for insulating oil purification and replacement for the period of 36 months in the kzn…

    Passenger Rail Agency of South Africa

    Closes 10 Dec 2026, 12:00

    • Electrical
    • CIDB 7
    • PSIRA
    • Compulsory briefing
    • Functionality 70%