Closes
In 3 days
Tuesday, 1 December 2026 at 12:00 SAST
Closing soon. Aim to submit a day early, by 30 Nov 2026: late bids aren't considered.
Add to calendar:GoogleApple or Outlook
Can you bid?
Confirmed for this tender:
CIDB grade 4EP or higher · At least 75% on functionality
Next step
Read the requirements below, then check the official documents before you commit time.
Check against your business, freeLast checked 26 Nov 2026, 15:56. 4 official documents. Missing from the listing: estimated value.
In short
- What they want
- HVAC Electrical and Control
- What must be delivered
- GENERAL INFORMATION FORMING PART OF THIS AGREEMENT 1. The Occupational Health & Safety Act comprises of SECTION 1-50 and all unrepealed REGULATIONS promulgated in terms of the former Machinery and Occupational Safety Act No.6 of 1983 as amended as well as other REGULATIONS which may be promulgated in terms of the Act and other relevant Acts pertaining to the job in hand. 2. "Mandatary" is defined as including as agent, a principal contractor or a contractor for work, but WITHOUT DEROGATING FROM HIS/HER STATUS IN HIS/HER RIGHT AS AN EMPLOYER or user of the plant 3.From NEC Bid - Maintenance of HVAC Electricals and Controls for 6 months.pdf, page 25. Read the full scope in the documents.
- How much and how long
- 6 months
- Delivery address
- OR Tambo International Airport, Kempton Park, Gauteng, 1634
- Who can bid
- CIDB grade 4EP or higher
- How it's scored
- You need at least 75% on functionality (quality) before price counts
- Specific goals: People with disabilities, Women ownership
A summary from the listing and the tender's documents. The official documents are the final word.
Key facts
- Estimated value
- Not published. We never estimate one.Work out your preference points
- Industry
- Electrical, Professional services
- Briefing session
- None listed
- CIDB grading
- Grade 4EP or higher
- Functionality threshold
- 75%
- Type
- Request for quotation (RFQ)
- Delivery location
- OR Tambo International Airport, Kempton Park, Gauteng, 1634
- Published
- 16 Nov 2026
Can your business bid on this?
ZA Network guidance, not part of the official listing.
What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, Functionality threshold, RFQ
- CSD (Central Supplier Database)
- National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
- Tax compliance status (SARS tax status, checked with a PIN)
- SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
- B-BBEE (Broad-Based Black Economic Empowerment)
- A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
- SBD forms (Standard Bidding Documents)
- National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
- CIDB (Construction Industry Development Board)
- The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
- Functionality threshold (The minimum quality score)
- Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.
- RFQ (Request for quotation)
- A smaller purchase where the buyer asks for a price rather than a full bid: a shorter closing date, fewer forms, and usually a decision on price and preference points alone. The same compliance (CSD, tax) applies.
General explanations of South African public procurement, not this tender's requirements: the tender pack decides.
Check it against your business
Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.
Confirmed for this tender
CIDB grade 4EP or higherRead from official document
The tender asks for this grading or higher.
Source: RFQ 74933 HVAC Electrical and Control System (2).pdf · page 5: “…A PERIOD OF SIX (6) MONTHS AT OR TAMBO INTERNATIONAL AIRPORT Only tenderers who are a CIDB contractor grading of 4EP or higher as stated on the Tender Data may submit tender offers. TENDER DOCUMENT AVAILABILITY Tender document are available from 15…”
At least 75% on functionalityRead from official document
Bids below the threshold aren't scored on price.
Source: NEC Bid - Maintenance of HVAC Electricals and Controls for 6 months.pdf · page 4: “…shall be evaluated in accordance with the criteria listed above. An overall threshold of 75 points out of 100 must be achieved for the tender to pass functionality. Description of quality criteria WQ Sub criteria Score Quality Score 1 Tenderer's resource proposal 70 Qualifications 40 Years of…”
We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.
Where and how to submit
Submit by email
Must arrive before Tuesday, 1 December 2026 at 12:00 SAST. Late bids are never accepted.
“…AND CONTROL SYSTEM FOR A PERIOD OF SIX (6) MONTHS AT OR TAMBO INTERNATIONAL AIRPORT BID RESPONSE DOCUMENTS SHALL BE SUBMITTED TO EMAIL: ACSARfq@airports.co.za BIDDING PROCEDURE ENQUIRIES MAY BE DIRECTED TO TECHNICAL ENQUIRIES MAY BE DIRECTED TO: CONTACT PERSON CONTACT PERSON TELEPHONE NUMBER TELEPHONE NUMBER FACSIMILE NUMBER FACSIMILE NUMBER E-MAIL ADDRESS E-MAIL ADDRESS SUPPLIER INFORMATION…” (RFQ 74933 HVAC Electrical and Control.pdf, page 2)
- Email your bid to acsarfq@airports.co.za
- Tender documents (the submission details are in the bid document)
- Find it on eTenders: search for RFQ74933
- Ask theo nkomo: theo.nkomo@airports.co.za
- Send it well before the closing time: mailboxes have size limits and emails can be delayed. Keep the sent email and any receipt as proof.
ZA Network never submits bids for you. The tender documents are the final word on where and how.
Before you submit
Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified
Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.
Tax compliance status valid on the closing date
Check it on SARS eFiling before 01 Dec 2026. A status that lapses before closing can cost you the award.
CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.
Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.
CIDB grade 4EP or higher
Active on the CIDB register on the closing date, or through a joint venture that meets the grade.
Reach 75% on functionality
Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for.
The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.
Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.
Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 30 Nov 2026, and check the address or upload method twice.
Official documents
- pdfRFQ 74933 HVAC Electrical and Control System (2).pdfFrom eTenders, 16 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfRFQ 74933 HVAC Electrical and Control.pdfFrom eTenders, 16 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfNEC Bid - Maintenance of HVAC Electricals and Controls for 6 months.pdfFrom eTenders, 17 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfRFQ 74933 HVAC Electrical and Control.pdfFrom eTenders, 17 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
Read from the official documents
What the tender documents say
Read by rules from 4 of 4 documents, 17 Nov 2026, 11:50. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.
- CIDB grading
Grade 4EP or higher
“…A PERIOD OF SIX (6) MONTHS AT OR TAMBO INTERNATIONAL AIRPORT Only tenderers who are a CIDB contractor grading of 4EP or higher as stated on the Tender Data may submit tender offers. TENDER DOCUMENT AVAILABILITY Tender document are available from 15…” (RFQ 74933 HVAC Electrical and Control System (2).pdf, page 5)
- Functionality threshold
Minimum 75% to be evaluated on price
“…shall be evaluated in accordance with the criteria listed above. An overall threshold of 75 points out of 100 must be achieved for the tender to pass functionality. Description of quality criteria WQ Sub criteria Score Quality Score 1 Tenderer's resource proposal 70 Qualifications 40 Years of…” (NEC Bid - Maintenance of HVAC Electricals and Controls for 6 months.pdf, page 4)
- Subcontracting required
At least 30% of the contract
“…and Supplier Development Initiatives It is a requirement of this project that the successful tenderer enters into a contract (either through partnership, joint ventures or sub-contractors) with Targeted Enterprise(s) as defined in the Contract Data to perform a minimum of Thirty percent (30%) of the tendered contract value. Tenderers must state transformation deliverables that are…” (NEC Bid - Maintenance of HVAC Electricals and Controls for 6 months.pdf, page 50)
- Specific goals
People with disabilities, Women ownership
“…5 Black women majority-owned entities 5 5 Company majority owned by people with disabilities 5 5 Non- compliant contributor 0 0 Bidder to provide proof to support The…” (RFQ 74933 HVAC Electrical and Control System (2).pdf, page 15)
- How to submit
By email
“…AND CONTROL SYSTEM FOR A PERIOD OF SIX (6) MONTHS AT OR TAMBO INTERNATIONAL AIRPORT BID RESPONSE DOCUMENTS SHALL BE SUBMITTED TO EMAIL: ACSARfq@airports.co.za BIDDING PROCEDURE ENQUIRIES MAY BE DIRECTED TO TECHNICAL ENQUIRIES MAY BE DIRECTED TO: CONTACT PERSON CONTACT PERSON TELEPHONE NUMBER TELEPHONE NUMBER FACSIMILE NUMBER FACSIMILE NUMBER E-MAIL ADDRESS E-MAIL ADDRESS SUPPLIER INFORMATION…” (RFQ 74933 HVAC Electrical and Control.pdf, page 2)
- Contract period
6 months
“…Confidential BID DOCUMENT FOR THE PROVISION OF HVAC ELECTRICAL AND CONTROL SYSTEM FOR A PERIOD OF SIX (6) MONTHS AT OR TAMBO INTERNATIONAL AIRPORT Bid Reference Number: 74933 DATE OF ISSUE: 15 September 2026 Issued by Airports Company South Africa OR…” (RFQ 74933 HVAC Electrical and Control System (2).pdf, page 1)
- Documents the pack mentions
- CSD registration report (RFQ 74933 HVAC Electrical and Control Sy, p. 28)
- Tax compliance status (SARS PIN) (RFQ 74933 HVAC Electrical and Control Sy, p. 3)
- B-BBEE certificate or sworn affidavit (RFQ 74933 HVAC Electrical and Control Sy, p. 15)
- CIDB registration certificate (RFQ 74933 HVAC Electrical and Control Sy, p. 59)
- COIDA letter of good standing (RFQ 74933 HVAC Electrical and Control Sy, p. 12)
- Company registration documents (CIPC) (RFQ 74933 HVAC Electrical and Control Sy, p. 28)
- Proof of briefing attendance (RFQ 74933 HVAC Electrical and Control Sy, p. 28)
- Joint venture or consortium agreement (RFQ 74933 HVAC Electrical and Control Sy, p. 22)
- Bank rating or bank letter (RFQ 74933 HVAC Electrical and Control Sy, p. 28)
- Reference letters from previous clients (RFQ 74933 HVAC Electrical and Control Sy, p. 14)
- Public liability insurance (NEC Bid - Maintenance of HVAC Electrical, p. 11)
- Disqualification rules
- “Alternative bids will not be considered” (RFQ 74933 HVAC Electrical and Control Sy, p. 8)
- “Bidders who also fail to achieve the minimum score per criteria will be disqualified and not be eligible for further evaluations” (RFQ 74933 HVAC Electrical and Control.pd, p. 12)
Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.
Changes to this tender
New or amended document · noticed 17 Nov 2026
New document published: RFQ 74933 HVAC Electrical and Control.pdf
New or amended document · noticed 17 Nov 2026
New document published: NEC Bid - Maintenance of HVAC Electricals and Controls for 6 months.pdf
My preparation
Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.
Sign in to save this tender, tick documents off and record your submission.
Documents to submit
General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.
Sign in to tick documents off and track your progress.
General guidance
Not part of this listing: what usually applies to South African public tenders.
Need money to deliver this? Tender and contract finance
Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.
Tender and contract financeHow to fund a contractGrants and programmes
If you win: payment terms, and the cash to carry
Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.
Description
From the official listing.
HVAC Electrical and Control
Special conditions
No Link Submission
Contact person
theo nkomo
About this data
- Source
- National Treasury eTenders
- Freshness
- Last checked 26 Nov 2026, 15:56. The official source last confirmed this listing 26 Nov 2026, 15:56. Check the official page for late changes.Last confirmed by eTenders on 26 Nov 2026, 15:56 (SAST). This page was generated on 28 Nov 2026, 11:59 (SAST). The status shown is only as current as the first of these.
- Official link
- Link not checked yet. We haven't checked that the official page opens.
- Open Contracting ID
- ocds-9t57fa-178320
- On eTenders
- Open the eTenders tender list and search for RFQ74933. The official record is also available as raw data.
- Missing from the listing
- Estimated value: eTenders rarely publishes a value. We never estimate one.
- Possible duplicate listings
- Same buyer and tender number: Provision of HVAC Electrical and Control System. Check which one the buyer is still using.
Report a problem with this data
South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.