Skip to content
ZA NetworkGet started
Public tender · eTendersState-owned companyGautengTender no. E3764EGDMWP

Provision of Installation and Infrastructure Upgrade for Anti-climb Perimeter Security Fence at Eskom Megawatt Park (MWP) for a period of Forty-Seven (47)…

ESKOM

Closes

In 4 days

Wednesday, 2 December 2026 at 10:00 SAST

Listed as open, but the official source has not confirmed it since 24 Nov 2026, 16:54 (SAST). It may have closed or changed: check the official page.

Closing soon. Aim to submit a day early, by 01 Dec 2026: late bids aren't considered.

Add to calendar:GoogleApple or Outlook

Can you bid?

Confirmed for this tender:

CIDB grade 7EP or higher · PSIRA registration · Compulsory briefing (already held)

Next step

Read the requirements below, then check the official documents before you commit time.

Check against your business, free

Not recently confirmed. 34 official documents. Missing from the listing: estimated value.

In short

What they want
Provision of Installation and Infrastructure Upgrade for Anti-climb Perimeter Security Fence at Eskom Megawatt Park (MWP) for a period of Forty-Seven (47) Months. (Eleven (11) months construction and Thirty-Six (36) months Maintenance and Support).
What must be delivered
C3 ECC3 COVER PAGE The figure below indicated the stormwater crossings along the boundary. The Contractor designs a pipe chamber that connects the 2 discharge pipes and directs the stormwater off site. At both stormwater pipe crossings, the Contractor designs and constructs culverts to allow the continuation of the patrol road near to the fence. The Culvert is sized and designed as a single lane crossing for the security patrol vehicle. The Contractor provides a crossing over the stormwater channel at the emergency gate so that the patrol road remains near the fence line.From NEC -contract.pdf, page 52. Read the full scope in the documents.
How much and how long
7 months · 11 months · 36 months
Delivery address
Eskom Megawatt Park (MWP) -Maxwell Dr, Sunninghill, Sandton, 2157, Sunninghill, Sandton, 2157
Who can bid
CIDB grade 7EP or higher · PSIRA-registered (security work) · Attended the compulsory briefing
How it's scored
  • You need at least 70% on functionality (quality) before price counts

A summary from the listing and the tender's documents. The official documents are the final word.

Key facts

Estimated value
Not published. We never estimate one.Work out your preference points
Industry
Construction
Briefing session
Compulsory, 12 Nov 2026, 10:00Eskom Megawatt Park (MWP) - Newtons 1 and 2
CIDB grading
Grade 7EP or higher
Functionality threshold
70%
Type
Tender (request for bid)Published as “Request for Bid(Open-Tender)”
Delivery location
Eskom Megawatt Park (MWP) -Maxwell Dr, Sunninghill, Sandton, 2157, Sunninghill, Sandton, 2157
Published
02 Nov 2026

Can your business bid on this?

ZA Network guidance, not part of the official listing.

What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, PSIRA, Functionality threshold, Compulsory briefing
CSD (Central Supplier Database)
National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
Tax compliance status (SARS tax status, checked with a PIN)
SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
B-BBEE (Broad-Based Black Economic Empowerment)
A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
SBD forms (Standard Bidding Documents)
National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
CIDB (Construction Industry Development Board)
The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
PSIRA (Private Security Industry Regulatory Authority)
Any business that provides security officers or guarding must be registered with PSIRA, and so must each security officer. A security tender asks for the business's registration certificate and usually the officers' grades. PSIRA registration information(opens in a new tab)
Functionality threshold (The minimum quality score)
Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.
Compulsory briefing (A compulsory site meeting or clarification session)
A meeting the buyer holds before closing, at the site or online. When it is compulsory, a bidder who did not attend and sign the register is disqualified, whatever the bid says.

General explanations of South African public procurement, not this tender's requirements: the tender pack decides.

Check it against your business

Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.

No account needed. Your answers stay in this page's link and aren't stored.

Confirmed for this tender

  • CIDB grade 7EP or higherRead from official document

    The tender asks for this grading or higher.

    Source: Invitation to Tender (ITT).pdf · page 10: “…CIDB Requirements are applicable 1. It is estimated that tenderers must have a Construction Industry Development Board (CIDB) contractor grading of 7EP or higher [Insert the best estimate of required Contractor grading designation. The clause above must be omitted: - (i) where the contract…”

  • PSIRA registrationRead from official document

    The business and its security officers must be registered with PSIRA.

    Source: Invitation to Tender (ITT).pdf · page 16: “…shall have valid registration with Private Security Industry Regulatory Authority (PSIRA) in the Republic of South Africa MANDATORY CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE Mandatory Contractual Requirement Proof of valid and current CSD Registration (CSD number/CSD…”

  • Compulsory briefing (already held)Stated in listing

    Bidders who don't attend are disqualified.

    Source: the official listing

  • At least 70% on functionalityRead from official document

    Bids below the threshold aren't scored on price.

    Source: Invitation to Tender (ITT).pdf · page 8: “…Invitation to Tender will be deemed non-responsive. 3.13 Functionality requirements Functionality requirements are applicable The following criteria will be applicable for this transaction under functionality criteria: Criteria Weight Threshold 70% Tenderers who do not meet the threshold for functionality scoring will be disqualified Refer to the technical evaluation criteria. 3.15…”

Not confirmed

  • Tender documents reviewed: 27 / 34 relevant documentsNot confirmed

    7 documents still need review: Apendix A1.1 _ Existing MWP MV Reticulation Visio _ Screenshot.docx (the download failed); Appendix A - Cable Schedule Template R0.1.xlsm (a format we can't read); MWP MV Reticulation SLD.pdf (scanned pages that can't be read automatically); Redlined _ MWP Lighting and Security Fence Layout 0.50-45006 pdf.pdf (scanned pages that can't be read automatically); Redlined _ MWP Site Plan Layout 0.50-45006 pdf.pdf (scanned pages that can't be read automatically); Screen shot for 11kV Mini Subs Ring Feed.docx (the download failed); 0.50-45006.pdf (scanned pages that can't be read automatically). Requirements in them aren't confirmed.

Check the official documents before you decide to bid.

Sign up to check your readiness

We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.

Where and how to submit

Submit electronically (online)

Must arrive before Wednesday, 2 December 2026 at 10:00 SAST. Late bids are never accepted.

“…to the following address by the stipulated closing date and time Tenders are to be submitted electronically via the Eskom e-Tendering system using the following link: https://etendering.eskom.co.za Please note: • All documents need to be submitted in a PDF format (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes). The…” (Invitation to Tender (ITT).pdf, page 1)

  • Register on the portal early and upload a day ahead: last-minute uploads fail. Save the submission confirmation.

ZA Network never submits bids for you. The tender documents are the final word on where and how.

Before you submit

Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified

  1. Sign every SBD form

    Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.

  2. Tax compliance status valid on the closing date

    Check it on SARS eFiling before 02 Dec 2026. A status that lapses before closing can cost you the award.

  3. CSD profile compliant, details matching

    Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.

  4. Proof for every point you claim

    Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.

  5. Briefing attendance certificate

    Include proof that you attended the compulsory briefing. Bidders who missed it are disqualified.

  6. CIDB grade 7EP or higher

    Active on the CIDB register on the closing date, or through a joint venture that meets the grade.

  7. PSIRA registration

    For the business and the security officers, current on the closing date.

  8. Reach 70% on functionality

    Bids below the threshold aren't scored on price. Include every CV, reference letter and method statement the scoring table asks for.

  9. The buyer's pricing schedule, complete

    Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.

  10. Every returnable schedule

    List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.

  11. Submit a day early

    Late bids aren't considered, even by a minute. Aim to submit by 01 Dec 2026, and check the address or upload method twice.

Official documents

Read from the official documents

What the tender documents say

Read by rules from 27 of 34 documents (7 couldn't be read: scanned pages, a format we can't read, or a download that failed; each one is marked under Official documents), 24 Nov 2026, 18:50. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.

CIDB grading

Grade 7EP or higher

“…CIDB Requirements are applicable 1. It is estimated that tenderers must have a Construction Industry Development Board (CIDB) contractor grading of 7EP or higher [Insert the best estimate of required Contractor grading designation. The clause above must be omitted: - (i) where the contract…” (Invitation to Tender (ITT).pdf, page 10)

Functionality threshold

Minimum 70% to be evaluated on price

“…Invitation to Tender will be deemed non-responsive. 3.13 Functionality requirements Functionality requirements are applicable The following criteria will be applicable for this transaction under functionality criteria: Criteria Weight Threshold 70% Tenderers who do not meet the threshold for functionality scoring will be disqualified Refer to the technical evaluation criteria. 3.15…” (Invitation to Tender (ITT).pdf, page 8)

PSIRA

PSIRA registration required

“…shall have valid registration with Private Security Industry Regulatory Authority (PSIRA) in the Republic of South Africa MANDATORY CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE Mandatory Contractual Requirement Proof of valid and current CSD Registration (CSD number/CSD…” (Invitation to Tender (ITT).pdf, page 16)

Subcontracting required

At least 51% of the contract, to designated group

“…sub-contractor 7.7 Which designated group does the sub-contractor belong to: - a) An EME or QSE; b) An EME or QSE which is at least 51% owned by black people; c) An EME or QSE which is at least 51% owned by black people who are youth; d) An EME or QSE which is at least 51% owned by…” (Invitation to Tender (ITT).pdf, page 28)

How to submit

Electronically (online)

“…to the following address by the stipulated closing date and time Tenders are to be submitted electronically via the Eskom e-Tendering system using the following link: https://etendering.eskom.co.za Please note: • All documents need to be submitted in a PDF format (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes). The…” (Invitation to Tender (ITT).pdf, page 1)

Bid validity

90 days after closing

“…2026 Closing date and time 02 December 2026 at 10:00 AM (South African Standard Time) Tender validity period 90 days from the closing date and time Clarification meeting Compulsory clarification meeting will be held. Date:12 November 2026 at 10:00 AM.…” (Invitation to Tender (ITT).pdf, page 1)

Contract period

6 months

“…if there are any identified repeat nonconformities from the same supplier within a period of 6 months or less. This must then be escalated to the management review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not…” (240-105658000 Supplier Quality Management Specification (3).pdf, page 26)

Documents the pack mentions
  • Proof of briefing attendance (240-105658000 Supplier Quality Managemen, p. 14)
  • CSD registration report (Invitation to Tender (ITT).pdf, p. 9)
  • Tax compliance status (SARS PIN) (Invitation to Tender (ITT).pdf, p. 14)
  • B-BBEE certificate or sworn affidavit (Invitation to Tender (ITT).pdf, p. 12)
  • CIDB registration certificate (Invitation to Tender (ITT).pdf, p. 26)
  • COIDA letter of good standing (Invitation to Tender (ITT).pdf, p. 16)
  • Company registration documents (CIPC) (Invitation to Tender (ITT).pdf, p. 26)
  • Joint venture or consortium agreement (Invitation to Tender (ITT).pdf, p. 6)
  • Professional registration (ECSA, SACQSP, SACPCMP or similar) (Invitation to Tender (ITT).pdf, p. 15)
  • PSIRA registration certificate (Technical Evaluation Criteria.pdf, p. 7)
  • Reference letters from previous clients (Technical Evaluation Criteria.pdf, p. 9)
Disqualification rules
  • “Tenderers that do not attend such mandatory/compulsory meeting will be disqualified and will not be evaluated” (Invitation to Tender (ITT).pdf, p. 7)
  • “Criteria Weight Threshold 70% Tenderers who do not meet the threshold for functionality scoring will be disqualified Refer to the technical evaluation criteria” (Invitation to Tender (ITT).pdf, p. 8)
  • “If not fully completed, signed (if required on the returnable) and/or submitted by tender closing, the tenderer will be disqualified” (Invitation to Tender (ITT).pdf, p. 12)
  • “nsent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 completed, signed if required and/or received by the Procurement Practitioner within 5 working days of the request, the tenderer will be disqualified” (Invitation to Tender (ITT).pdf, p. 13)
  • “A [tender/proposal] will be disqualified if the tenderer/s, or any of its directors have: 1” (Invitation to Tender (ITT).pdf, p. 31)
  • “Tenderers that do not pass the Mandatory Criteria evaluation will not be evaluated further” (Pre_developed Evalution Criteria for com, p. 4)

Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.

Changes to this tender

  1. New or amended document · noticed 24 Nov 2026

    New document published: ADDENDUM 01.pdf

  2. New or amended document · noticed 18 Nov 2026

    New document published: NEC - 12 Nov 2026.pdf

  3. New or amended document · noticed 18 Nov 2026

    New document published: Screen shot for 11kV Mini Subs Ring Feed.docx

  4. New or amended document · noticed 18 Nov 2026

    New document published: 240-56364545 Structural Design and Engineering Standard (Rev 4).pdf

  5. New or amended document · noticed 18 Nov 2026

    New document published: Redlined _ MWP Site Plan Layout 0.50-45006 pdf.pdf

  6. New or amended document · noticed 18 Nov 2026

    New document published: 240-170000096 Rev 1 Physical Security Intergrated Standard.pdf

  7. New or amended document · noticed 18 Nov 2026

    New document published: 0.50-45006.pdf

  8. New or amended document · noticed 18 Nov 2026

    New document published: 240-91190304 Rev 2.pdf

  9. New or amended document · noticed 18 Nov 2026

    New document published: Supplier Development,Localisation and Industrialisation (SDL&I) Strategy.pdf

  10. New or amended document · noticed 18 Nov 2026

    New document published: Pre_developed Evalution Criteria for compliance to NLEPDS rev 6_signed.pdf

  11. New or amended document · noticed 18 Nov 2026

    New document published: Standard for Non-Lethal Energized Perimeter Detection System (NLEPDS) Electrical Components.pdf

  12. New or amended document · noticed 18 Nov 2026

    New document published: ADDENDUM 01.pdf

  13. New or amended document · noticed 18 Nov 2026

    New document published: DK 240-139282493 Security Lighting for Eskom Applications.pdf

  14. New or amended document · noticed 18 Nov 2026

    New document published: Appendix A - Cable Schedule Template R0.1.xlsm

  15. New or amended document · noticed 18 Nov 2026

    New document published: MWP MV Reticulation SLD.pdf

  16. New or amended document · noticed 18 Nov 2026

    New document published: Apendix A1.1 _ Existing MWP MV Reticulation Visio _ Screenshot.docx

  17. New or amended document · noticed 18 Nov 2026

    New document published: Redlined _ MWP Lighting and Security Fence Layout 0.50-45006 pdf.pdf

  18. New or amended document · noticed 18 Nov 2026

    New document published: 240-76368574 - Security perimeter HIGH MESH FENCE STANDARDS.pdf

  19. New or amended document · noticed 18 Nov 2026

    New document published: 240-78980848 - Standard for NLEPDS Electrical Components rev4.pdf

  20. New or amended document · noticed 02 Nov 2026

    New document published: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf

  21. New or amended document · noticed 02 Nov 2026

    New document published: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf

  22. New or amended document · noticed 02 Nov 2026

    New document published: 20260313_ Form A Cat3_ ERE _ MWP Perimeter Security Fence Upgrade .pdf

My preparation

Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.

Sign in to save this tender, tick documents off and record your submission.

Documents to submit

General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.

Sign in to tick documents off and track your progress.

Price the buyer's schedule

The pricing schedule lists 30 items (BOQ_.xlsx › B1 P&G). We've copied the items and quantities into the bid price calculator: add your prices to see the total, VAT and the lowest you can go.

Open in the bid price calculator

General guidance

Not part of this listing: what usually applies to South African public tenders.

Need money to deliver this? Tender and contract finance

Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.

Tender and contract financeHow to fund a contractGrants and programmes

If you win: payment terms, and the cash to carry

Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.

Description

From the official listing.

Provision of Installation and Infrastructure Upgrade for Anti-climb Perimeter Security Fence at Eskom Megawatt Park (MWP) for a period of Forty-Seven (47) Months. (Eleven (11) months construction and Thirty-Six (36) months Maintenance and Support).

Contact person

Dakalo Mugadi

mugadid@eskom.co.za

011-692-8234

About this data

Source
National Treasury eTenders
Freshness
Not recently confirmed. The official source last confirmed this listing 24 Nov 2026, 16:54. It may have changed or been withdrawn: check the official page before relying on it.Last confirmed by eTenders on 24 Nov 2026, 16:54 (SAST). This page was generated on 28 Nov 2026, 11:59 (SAST). The status shown is only as current as the first of these.
Official link
Link not checked yet. We haven't checked that the official page opens.
Open Contracting ID
ocds-9t57fa-176719
On eTenders
Open the eTenders tender list and search for E3764EGDMWP. The official record is also available as raw data.
Missing from the listing
  • Estimated value: eTenders rarely publishes a value. We never estimate one.

Report a problem with this data

South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.

The competition

118 past awards by this buyer.

See who won

Winners, repeat suppliers and their sizes are shown to signed-in accounts. Create a free account to see them.

Similar open tenders