Closes
Closed
Friday, 27 November 2026 at 12:00 SAST
Can you bid?
Confirmed for this tender:
Compulsory briefing (already held) · At least 64% on functionality
Next step
This tender has closed. Look at similar open tenders instead.
Not recently confirmed. 24 official documents. Missing from the listing: estimated value.
In short
- What they want
- Request for bids for the replacement of the instrument landing systems at the or tambo international airport for a period no exceeding 36 months.
- What must be delivered
- OR TAMBO INTERNATIONAL AIRPORT Project Duration: 36 Months 1. General Scope of Work The ILS consists of: • Localizer electronic system and localizer antenna subsystems • Glide slope electronic system and glide slope antenna subsystems • Distance Indication Equipment - DME subsystems • Localizer far field monitoring equipment. • Localizer and glide path near field monitoring. • Remote control status unit (RCSU) and Control Tower Unit (CTU). The scope includes but not limited to the following: • Geographical and positioning survey study to cater for terrain variation. • Software simulation. • Design and selection of the most suitable CAT III ready ILS at RWY 03R, 21L, 03L, and 21R.From ANNEXURE A- NEC3 ECC ILS REPLACEMENT PROJECT ORTIA 2026.pdf, page 52. Read the full scope in the documents.
- How much and how long
- 36 months
- Delivery address
- 1 Jones Road, Kempton Park, Kempton Park
- Who can bid
- Attended the compulsory briefing
- How it's scored
- You need at least 64% on functionality (quality) before price counts
- Specific goals: Black ownership, Women ownership, Youth ownership
A summary from the listing and the tender's documents. The official documents are the final word.
Key facts
- Estimated value
- Not published. We never estimate one.Work out your preference points
- Industry
- Professional services
- Briefing session
- Compulsory, 16 Oct 2026, 12:00Microsoft Teams
- CIDB grading
- Not stated in the listing
- Functionality threshold
- 64%
- Type
- Tender (request for bid)Published as “Request for Bid(Open-Tender)”
- Delivery location
- 1 Jones Road, Kempton Park, Kempton Park
- Published
- 02 Oct 2026
Can your business bid on this?
ZA Network guidance, not part of the official listing.
What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, Functionality threshold, Compulsory briefing
- CSD (Central Supplier Database)
- National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
- Tax compliance status (SARS tax status, checked with a PIN)
- SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
- B-BBEE (Broad-Based Black Economic Empowerment)
- A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
- SBD forms (Standard Bidding Documents)
- National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
- Functionality threshold (The minimum quality score)
- Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.
- Compulsory briefing (A compulsory site meeting or clarification session)
- A meeting the buyer holds before closing, at the site or online. When it is compulsory, a bidder who did not attend and sign the register is disqualified, whatever the bid says.
General explanations of South African public procurement, not this tender's requirements: the tender pack decides.
Confirmed for this tender
Compulsory briefing (already held)Stated in listing
Bidders who don't attend are disqualified.
Source: the official listing
At least 64% on functionalityRead from official document
Bids below the threshold aren't scored on price.
Source: Minutes of Briefing Session.pdf · page 3: “…from the OEM and include identifiable details such as letterhead and signatures. 4.2 Functionality Evaluation An overall minimum score of 64 out of 100 is required to proceed to Price and Preference evaluation. i. Company Experience (30 points) Bidders must provide client reference letters…”
Not confirmed
Tender documents reviewed: 19 / 24 relevant documentsNot confirmed
5 documents still need review: ANNEXURE E- GP03R REFLECTION SCREEN SITE PLAN.pdf (scanned pages that can't be read automatically); ANNEXURE G- ATNS ACSA ILS LAYOUT 1.pdf (scanned pages that can't be read automatically); ANNEXURE H- GLIDE PATH 03L POSSIBLE NEW POSITION.pdf (scanned pages that can't be read automatically); ANNEXURE K- ORTIA SHELTER DRAWING.pdf (scanned pages that can't be read automatically); Briefing Session Presentation.pptx (a format we can't read). Requirements in them aren't confirmed.
Check the official documents before you decide to bid.
We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.
Official documents
- pdfORTIA81982026RFP- final published.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE A- NEC3 ECC ILS REPLACEMENT PROJECT ORTIA 2026.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE B- SPECIFICATIONS FOR ILS.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE C- SPECIFICATIONS FOR DME.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE D- D109 MAN STANDARDS AND GUIDELINES FOR INSTRUMENT LANDING SYSTEM.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE E- GP03R REFLECTION SCREEN SITE PLAN.pdfFrom eTenders, 02 Oct 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdfANNEXURE F- GP03R SCALLOPING SCREEN PROPOSAL.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE G- ATNS ACSA ILS LAYOUT 1.pdfFrom eTenders, 02 Oct 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdfANNEXURE H- GLIDE PATH 03L POSSIBLE NEW POSITION.pdfFrom eTenders, 02 Oct 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdfANNEXURE I- ORTIA GP SHELTER DRAWING.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE J- ORTIA LLZ SHELTER DRWING.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE K- ORTIA SHELTER DRAWING.pdfFrom eTenders, 02 Oct 2026Not read for requirements: scanned pages that can't be read automatically. Read it yourself before you rely on this page.(opens in a new tab)
- pdfANNEXURE L- ILS OTN SERVICES 1.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE M- SSR 15010 OR TAMBO GP03R.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE N- ENVIRONMENTAL TERMS AND CONDITIONS.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE O- OCCUPATIONAL HEALTH AND SAFETY AGREEMENT.pdfFrom eTenders, 02 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pptxBriefing Session Presentation.pptxFrom eTenders, 29 Oct 2026Not read for requirements: a format we can't read. Read it yourself before you rely on this page.(opens in a new tab)
- pdfAddendum 01.pdfFrom eTenders, 29 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfClarification 01.pdfFrom eTenders, 29 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfBriefing session register.pdfFrom eTenders, 29 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfMinutes of Briefing Session.pdfFrom eTenders, 29 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfClarification 02.pdfFrom eTenders, 13 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAddendum 02.pdfFrom eTenders, 13 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE A- NEC3 ECC ILS REPLACEMENT PROJECT ORTIA 2026 V2.pdfFrom eTenders, 13 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
Read from the official documents
What the tender documents say
Read by rules from 19 of 24 documents (5 couldn't be read: scanned pages, a format we can't read, or a download that failed; each one is marked under Official documents), 24 Nov 2026, 17:50. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.
- Functionality threshold
Minimum 64% to be evaluated on price
“…from the OEM and include identifiable details such as letterhead and signatures. 4.2 Functionality Evaluation An overall minimum score of 64 out of 100 is required to proceed to Price and Preference evaluation. i. Company Experience (30 points) Bidders must provide client reference letters…” (Minutes of Briefing Session.pdf, page 3)
- Subcontracting required
At least 5% of the contract, to EMEs
“…Status Level 8 0.1 Sub-contracting of a minimum of 5% of the contract value to South African EMEs and/or QSEs 51% owned by black people, youth, women or disabled people. 5 Non- compliant contributor 0” (ORTIA81982026RFP- final published.pdf, page 24)
- Briefing
Briefing session on 16 October 2026 (the document doesn't say whether it's compulsory)
“…Issue Date : 2 October 2026 Briefing Session Date : 16 October 2026 @ 12:00PM Query Closing Date : 23 October 2026 Bid Closing Date and Time Requirements : 13 November 2026 @ 12:00PM” (ORTIA81982026RFP- final published.pdf, page 1)
- Specific goals
Black ownership, Women ownership, Youth ownership
“…the contract value to South African EMEs and/or QSEs 51% owned by black people, youth, women or disabled people. 5 Non- compliant contributor 0” (ORTIA81982026RFP- final published.pdf, page 24)
- Contract period
36 months
“…and Commissioning 1 5 Flight Calibration 2 6. Acquisition of Spare Parts 1 6 After Sales Service 1 7 Timelines (within 36 months) 1 8 Interdependencies 1 10 4. TECHNICAL SPECIFICATIONS 30 Bidders are required to confirm whether their ILS systems have the following…” (ORTIA81982026RFP- final published.pdf, page 10)
- Documents the pack mentions
- Reference letters from previous clients (Clarification 01.pdf, p. 1)
- Proof of briefing attendance (Briefing session register.pdf, p. 1)
- CSD registration report (ORTIA81982026RFP- final published.pdf, p. 14)
- Tax compliance status (SARS PIN) (ORTIA81982026RFP- final published.pdf, p. 3)
- B-BBEE certificate or sworn affidavit (ORTIA81982026RFP- final published.pdf, p. 14)
- Company registration documents (CIPC) (ORTIA81982026RFP- final published.pdf, p. 14)
- Professional registration (ECSA, SACQSP, SACPCMP or similar) (ANNEXURE D- D109 MAN STANDARDS AND GUIDE, p. 7)
- CIDB registration certificate (ANNEXURE A- NEC3 ECC ILS REPLACEMENT PRO, p. 2)
- Public liability insurance (ANNEXURE A- NEC3 ECC ILS REPLACEMENT PRO, p. 21)
- Disqualification rules
- “This bid document may not be changed or altered in any manner, any change to the content of the bid document will lead to disqualification as it will be changing the terms and conditions of the tender” (ORTIA81982026RFP- final published.pdf, p. 7)
- “Bidders which fail to meet minimum requirements, thresholds or have not submitted required mandatory documents will be disqualified from the bid process” (ORTIA81982026RFP- final published.pdf, p. 8)
- “Mandatory Requirements Bidders who fail to meet the following mandatory criteria will be disqualified: I” (ORTIA81982026RFP- final published.pdf, p. 8)
- “Bids submitted in any foreign currency will be disqualified automatically” (ANNEXURE A- NEC3 ECC ILS REPLACEMENT PRO, p. 27)
Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.
Changes to this tender
New or amended document · noticed 24 Nov 2026
New document published: Clarification 02.pdf
New or amended document · noticed 24 Nov 2026
New document published: Addendum 02.pdf
New or amended document · noticed 24 Nov 2026
New document published: ANNEXURE A- NEC3 ECC ILS REPLACEMENT PROJECT ORTIA 2026 V2.pdf
Closing date changed · noticed 31 Oct 2026
13 Nov 2026, 12:00 → 27 Nov 2026, 12:00
New or amended document · noticed 31 Oct 2026
New document published: Briefing Session Presentation.pptx
New or amended document · noticed 31 Oct 2026
New document published: Clarification 01.pdf
New or amended document · noticed 31 Oct 2026
New document published: Briefing session register.pdf
New or amended document · noticed 31 Oct 2026
New document published: Minutes of Briefing Session.pdf
New or amended document · noticed 31 Oct 2026
New document published: Addendum 01.pdf
My preparation
Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.
Sign in to save this tender, tick documents off and record your submission.
Documents to submit
General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.
Sign in to tick documents off and track your progress.
Description
From the official listing.
REQUEST FOR BIDS FOR THE REPLACEMENT OF THE INSTRUMENT LANDING SYSTEMS AT THE OR TAMBO INTERNATIONAL AIRPORT FOR A PERIOD NO EXCEEDING 36 MONTHS.
Contact person
Alicia Sekoati
About this data
- Source
- National Treasury eTenders
- Freshness
- Not recently confirmed. The official source last confirmed this listing 24 Nov 2026, 16:54. It may have changed or been withdrawn: check the official page before relying on it.Last confirmed by eTenders on 24 Nov 2026, 16:54 (SAST). This page was generated on 28 Nov 2026, 16:38 (SAST). The status shown is only as current as the first of these.
- Official link
- Link not checked yet. We haven't checked that the official page opens.
- Open Contracting ID
- ocds-9t57fa-172641
- On eTenders
- Open the eTenders tender list and search for ORTIA81982026/RFP. The official record is also available as raw data.
- Missing from the listing
- Estimated value: eTenders rarely publishes a value. We never estimate one.
Report a problem with this data
South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.