Closes
In 4 days
Wednesday, 2 December 2026 at 10:00 SAST
Listed as open, but the official source has not confirmed it since 24 Nov 2026, 16:54 (SAST). It may have closed or changed: check the official page.
Closing soon. Aim to submit a day early, by 01 Dec 2026: late bids aren't considered.
Add to calendar:GoogleApple or Outlook
Can you bid?
Confirmed for this tender:
CIDB grade 7 or higher · Compulsory briefing (already held)
Next step
Read the requirements below, then check the official documents before you commit time.
Check against your business, freeNot recently confirmed. 27 official documents. Missing from the listing: estimated value.
In short
- What they want
- Supply, delivery and installation of additional mass meters at KUSILE POWER station
- What must be delivered
- PAGE 33 C3.1 ECSC3 WORKSINFORMATION • The order and planning of operations which the Contractor plans to do in order to provide the works. • The Contractor prepares and submits an update, seven days after the start date, showing actual progress and the effect upon the remainder of the activities to be completed. 6. Services and other things provided by the Employer The Contractor will inform the Employer of any scaffolding requirements for the installation as soon as the exact locations and routes are identified and finalised. The Employer will need 2 weeks to arrange for the necessary scaffolding to be erected.From Revised NEC3 ECSC - Supply,Delivery and Installation of Additional Mass Meters.pdf, page 33. Read the full scope in the documents.
- How much and how long
- 7 days · 2 weeks · 12 months
- Delivery address
- KUSILE POWER STATION, EMALAHLENI/VICTOR KHANYE, EMALAHLENI/VICTOR KHANYE, 1035
- Who can bid
- CIDB grade 7 or higher · Attended the compulsory briefing
- How it's scored
- 80/20 preference points: 80 for price, 20 for specific goals
A summary from the listing and the tender's documents. The official documents are the final word.
Key facts
- Estimated value
- Not published. We never estimate one.Work out your preference points
- Industry
- Supplies and stationery
- Briefing session
- Compulsory, 15 Oct 2026, 14:00KUSILE POWER STATION
- CIDB grading
- Grade 7 or higher
- Functionality threshold
- Not stated in the listing. The tender document decides.
- Type
- Tender (request for bid)Published as “Request for Bid(Open-Tender)”
- Delivery location
- KUSILE POWER STATION, EMALAHLENI/VICTOR KHANYE, EMALAHLENI/VICTOR KHANYE, 1035
- Published
- 06 Oct 2026
Can your business bid on this?
ZA Network guidance, not part of the official listing.
What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, Compulsory briefing
- CSD (Central Supplier Database)
- National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
- Tax compliance status (SARS tax status, checked with a PIN)
- SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
- B-BBEE (Broad-Based Black Economic Empowerment)
- A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
- SBD forms (Standard Bidding Documents)
- National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
- CIDB (Construction Industry Development Board)
- The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
- Compulsory briefing (A compulsory site meeting or clarification session)
- A meeting the buyer holds before closing, at the site or online. When it is compulsory, a bidder who did not attend and sign the register is disqualified, whatever the bid says.
General explanations of South African public procurement, not this tender's requirements: the tender pack decides.
Check it against your business
Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.
Confirmed for this tender
CIDB grade 7 or higherRead from official document
The tender asks for this grading or higher.
Source: Invitation to Tender mass meters E2368GXMPKUSR.pdf · page 4: “…service or service contract or an order issued in terms of such a contract; or b) a CIDB grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract.…”
Compulsory briefing (already held)Stated in listing
Bidders who don't attend are disqualified.
Source: the official listing
Not confirmed
Tender documents reviewed: 24 / 26 relevant documentsNot confirmed
2 documents still need review: Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls (a format we can't read); Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (a format we can't read). Requirements in them aren't confirmed.
Check the official documents before you decide to bid.
We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.
Where and how to submit
Submit electronically (online)
Must arrive before Wednesday, 2 December 2026 at 10:00 SAST. Late bids are never accepted.
“…address by the stipulated closing date and time Not applicable Tenders are to be submitted electronically via Eskom E- tendering site by the stipulated closing date and time. Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time https://eTendering.eskom.co.za” (Invitation to Tender mass meters E2368GXMPKUSR.pdf, page 1)
- Submit online: etendering.eskom.co.za
- Tender documents (the submission details are in the bid document)
- Find it on eTenders: search for E2368GXMPKUSR
- Ask Sebotso Lorraine Maepa: maepasl@eskom.co.za
- Register on the portal early and upload a day ahead: last-minute uploads fail. Save the submission confirmation.
ZA Network never submits bids for you. The tender documents are the final word on where and how.
Before you submit
Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified
Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.
Tax compliance status valid on the closing date
Check it on SARS eFiling before 02 Dec 2026. A status that lapses before closing can cost you the award.
CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.
Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.
Briefing attendance certificate
Include proof that you attended the compulsory briefing. Bidders who missed it are disqualified.
CIDB grade 7 or higher
Active on the CIDB register on the closing date, or through a joint venture that meets the grade.
The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.
Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.
Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 01 Dec 2026, and check the address or upload method twice.
Official documents
- pdfNon-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfEskom - Standard Conditions of Tender (February 2022).pdfFrom eTenders, 05 Oct 2026General document: not read for this tender's own requirements.(opens in a new tab)
- pdf20210603_communication_Labour Taxation Questionnaire.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfSBD 1 - Part A Invitation to Bid.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfIntegrity Declaration Form.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAuthorisation Form - 08 November 2024.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdf240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- docx240-68099512 Form A_Cat 3_ Rev 9.docxFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfLabour Taxation Questionnaire.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfEnvironmental requirement_.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfKUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- xlsSupplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xlsFrom eTenders, 05 Oct 2026Not read for requirements: a format we can't read. Read it yourself before you rely on this page.(opens in a new tab)
- pdfSBD 4 - Tenderer's Disclosure.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfSBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025 (1).pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- docSupplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.docFrom eTenders, 05 Oct 2026Not read for requirements: a format we can't read. Read it yourself before you rely on this page.(opens in a new tab)
- docxSupplier Declaration of Interest.docxFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfSBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdfFrom eTenders, 05 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfKUS-20250302 Kusile Power Station for Additional Mass Meters Scope of Works Rev 1 (1).pdfFrom eTenders, 07 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfKUS-20250303 Kusile Power Station Additional Mass Meters Tender Evaluation criteria Rev 1 .pdfFrom eTenders, 07 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfInvitation to Tender mass meters E2368GXMPKUSR.pdfFrom eTenders, 07 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfNEC3 ECSC - Supply, Delivery and Installation of Additional Mass Meters revised.pdfFrom eTenders, 07 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfTender Questions and Answers E2368GXMPKUSR 26102026.pdfFrom eTenders, 26 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfADDENDA NO.1 TENDER EXTENSION - E2368GXMPKUSR mass meter.pdfFrom eTenders, 26 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfKUS-20250302 Kusile Power Station for Additional Mass Meters Scope of Works Rev. 3.pdfFrom eTenders, 26 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfTender Questions and Answers E2368GXMPKUSR.pdfFrom eTenders, 26 Oct 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfADDENDA NO.1 TENDER EXTENSION - E2368GXMPKUSR mass meter price list.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfRevised NEC3 ECSC - Supply,Delivery and Installation of Additional Mass Meters.pdfFrom eTenders, 19 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
Read from the official documents
What the tender documents say
Read by rules from 25 of 27 documents (2 couldn't be read: scanned pages, a format we can't read, or a download that failed; each one is marked under Official documents), 24 Nov 2026, 18:50. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.
- CIDB grading
Grade 7 or higher
“…service or service contract or an order issued in terms of such a contract; or b) a CIDB grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract.…” (Invitation to Tender mass meters E2368GXMPKUSR.pdf, page 4)
- Subcontracting required
At least 25% of the contract
“…contracts of an estimated minimum project duration of 6 months; and (c) construction works contracts in which at least 25% of the main contract could reasonably be expected to be subcontracted out in one or more of the following CIDB classes of construction works: i) Civil Engineering (CE) ii) Electrical Engineering Work (EB) iii) General Building Works (GB) iv) Mechanical Engineering (ME) [To be downloaded…” (Invitation to Tender mass meters E2368GXMPKUSR.pdf, page 4)
- Preference points
80/20 system
“…stipulate in the case of— (a) an invitation for tender for income-generating contracts, 80/20 preference point system will apply and that the highest acceptable tender will be used to determine the applicable preference point system; or (b) any other invitation for…” (Invitation to Tender mass meters E2368GXMPKUSR.pdf, page 40)
- How to submit
Electronically (online)
“…address by the stipulated closing date and time Not applicable Tenders are to be submitted electronically via Eskom E- tendering site by the stipulated closing date and time. Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time https://eTendering.eskom.co.za” (Invitation to Tender mass meters E2368GXMPKUSR.pdf, page 1)
- Bid validity
90 days after closing
“…E2368GXMPKUSR Issue date 06 October 2026 Closing date and time 06 November 2026 10h00 Tender validity period 90 days from the closing date and time Clarification meeting Compulsory site clarification meeting Date: 15 October 2026 Meeting time: 14:00 Venue:…” (Invitation to Tender mass meters E2368GXMPKUSR.pdf, page 1)
- Contract period
12 months
“…to a contract, or an order issued in terms of a framework agreement that has a duration of 12 months or more, and to: a) a contract of R5 million or more, in the case of a professional service or service contract or an order issued in terms…” (Invitation to Tender mass meters E2368GXMPKUSR.pdf, page 4)
- Documents the pack mentions
- Tax compliance status (SARS PIN) (SBD 1 - Part A Invitation to Bid.pdf, p. 2)
- CSD registration report (Invitation to Tender mass meters E2368GX, p. 9)
- B-BBEE certificate or sworn affidavit (Invitation to Tender mass meters E2368GX, p. 10)
- CIDB registration certificate (Invitation to Tender mass meters E2368GX, p. 21)
- COIDA letter of good standing (Invitation to Tender mass meters E2368GX, p. 13)
- Company registration documents (CIPC) (Invitation to Tender mass meters E2368GX, p. 21)
- Joint venture or consortium agreement (Invitation to Tender mass meters E2368GX, p. 6)
- Professional registration (ECSA, SACQSP, SACPCMP or similar) (Invitation to Tender mass meters E2368GX, p. 13)
- Proof of briefing attendance (KUS-20250803 Kusile Power Station OHS Sp, p. 28)
- Reference letters from previous clients (Tender Questions and Answers E2368GXMPKU, p. 2)
- Disqualification rules
- “Tenderers that do not attend such mandatory/compulsory meeting will be disqualified and will not be evaluated” (Invitation to Tender mass meters E2368GX, p. 7)
- “Tenderers who do not meet the threshold for functionality scoring will be disqualified” (Invitation to Tender mass meters E2368GX, p. 8)
- “If not fully completed, signed (if required on the returnable) and/or submitted by tender closing, the tenderer will be disqualified” (Invitation to Tender mass meters E2368GX, p. 10)
- “If the returnable is not fully completed, signed if required and/or received by the Procurement Practitioner within 5 working days of the request, the tenderer will be disqualified” (Invitation to Tender mass meters E2368GX, p. 10)
- “A tender will be disqualified if the tenderer/s, or any of its directors have: 1” (Invitation to Tender mass meters E2368GX, p. 26)
- “Suppliers who will obtain scores below minimum threshold will not be considered for further evaluations but will be disqualified” (KUS-20250303 Kusile Power Station Additi, p. 4)
- “Any tender that is based on 100% sub-contracting will be deemed ineligible and will be disqualified” (Eskom - Standard Conditions of Tender (F, p. 2)
- “If one (1) complete hard copy of the original tender is not submitted, the tender will be disqualified” (Eskom - Standard Conditions of Tender (F, p. 3)
- “the tender will be disqualified” (Eskom - Standard Conditions of Tender (F, p. 6)
- “If this SD&L Undertaking is not completed and submitted as indicated in the Invitation to Tender, your tender will not be considered for contract award” (Eskom - Standard Conditions of Tender (F, p. 6)
Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.
Changes to this tender
New or amended document · noticed 24 Nov 2026
New document published: ADDENDA NO.1 TENDER EXTENSION - E2368GXMPKUSR mass meter price list.pdf
New or amended document · noticed 24 Nov 2026
New document published: Revised NEC3 ECSC - Supply,Delivery and Installation of Additional Mass Meters.pdf
Closing date changed · noticed 24 Nov 2026
20 Nov 2026, 10:00 → 02 Dec 2026, 10:00
Closing date changed · noticed 01 Nov 2026
06 Nov 2026, 10:00 → 20 Nov 2026, 10:00
New or amended document · noticed 01 Nov 2026
New document published: Tender Questions and Answers E2368GXMPKUSR.pdf
New or amended document · noticed 01 Nov 2026
New document published: ADDENDA NO.1 TENDER EXTENSION - E2368GXMPKUSR mass meter.pdf
New or amended document · noticed 01 Nov 2026
New document published: KUS-20250302 Kusile Power Station for Additional Mass Meters Scope of Works Rev. 3.pdf
New or amended document · noticed 01 Nov 2026
New document published: Tender Questions and Answers E2368GXMPKUSR 26102026.pdf
New or amended document · noticed 07 Oct 2026
New document published: NEC3 ECSC - Supply, Delivery and Installation of Additional Mass Meters revised.pdf
New or amended document · noticed 07 Oct 2026
New document published: Invitation to Tender mass meters E2368GXMPKUSR.pdf
New or amended document · noticed 07 Oct 2026
New document published: KUS-20250303 Kusile Power Station Additional Mass Meters Tender Evaluation criteria Rev 1 .pdf
New or amended document · noticed 07 Oct 2026
New document published: KUS-20250302 Kusile Power Station for Additional Mass Meters Scope of Works Rev 1 (1).pdf
My preparation
Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.
Sign in to save this tender, tick documents off and record your submission.
Documents to submit
General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.
Sign in to tick documents off and track your progress.
General guidance
Not part of this listing: what usually applies to South African public tenders.
Need money to deliver this? Tender and contract finance
Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.
Tender and contract financeHow to fund a contractGrants and programmes
If you win: payment terms, and the cash to carry
Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.
Description
From the official listing.
SUPPLY, DELIVERY AND INSTALLATION OF ADDITIONAL MASS METERS AT KUSILE POWER STATION
Special conditions
PPE REQUIRED FOR THE SITE WALK
Contact person
Sebotso Lorraine Maepa
About this data
- Source
- National Treasury eTenders
- Freshness
- Not recently confirmed. The official source last confirmed this listing 24 Nov 2026, 16:54. It may have changed or been withdrawn: check the official page before relying on it.Last confirmed by eTenders on 24 Nov 2026, 16:54 (SAST). This page was generated on 28 Nov 2026, 11:59 (SAST). The status shown is only as current as the first of these.
- Official link
- Link not checked yet. We haven't checked that the official page opens.
- Open Contracting ID
- ocds-9t57fa-172930
- On eTenders
- Open the eTenders tender list and search for E2368GXMPKUSR. The official record is also available as raw data.
- Missing from the listing
- Estimated value: eTenders rarely publishes a value. We never estimate one.
Report a problem with this data
South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.