Can you bid?
Confirmed for this tender:
Reserved for QSEs
Not confirmed: CIDB grade.
Next step
Read the requirements below, then check the official documents before you commit time.
Check against your business, freeLast checked 27 Nov 2026, 02:37. 7 official documents. Missing from the listing: estimated value.
In short
- What they want
- Supply, delivery, testing and commissioning of high voltage testers for the rotating machines depot in Durban on an 'as and when required' basis
- What must be delivered
- We couldn't find the scope of work in the documents we read. Look for "scope of work", "specification" or "terms of reference" in the official documents.
- Delivery address
- 150 Eel Road, Umbilo, Durban, 4000
- Who can bid
- Set aside for QSE businesses
- How it's scored
- Specific goals: Women ownership, Youth ownership, Black ownership, People with disabilities
A summary from the listing and the tender's documents. The official documents are the final word.
Key facts
- Estimated value
- Not published. We never estimate one.Work out your preference points
- Industry
- Engineering, Manufacturing
- Briefing session
- Optional, 26 Nov 2026, 11:00https://teams.microsoft.com/meet/3471074359107897?p=9yqqousWjI6BwYutf0
- CIDB grading
- Not confirmed: no grade found in the listing or documents
- Functionality threshold
- Not stated in the listing. The tender document decides.
- Type
- Tender (request for bid)Published as “Request for Bid(Open-Tender)”
- Delivery location
- 150 Eel Road, Umbilo, Durban, 4000
- Published
- 24 Nov 2026
Can your business bid on this?
ZA Network guidance, not part of the official listing.
What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, Set-aside (EME, QSE)
- CSD (Central Supplier Database)
- National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
- Tax compliance status (SARS tax status, checked with a PIN)
- SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
- B-BBEE (Broad-Based Black Economic Empowerment)
- A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
- SBD forms (Standard Bidding Documents)
- National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
- CIDB (Construction Industry Development Board)
- The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
- Set-aside (EME, QSE) (Reserved for businesses of a size)
- An EME (exempted micro enterprise) has a yearly turnover of R10 million or less; a QSE (qualifying small enterprise) between R10 million and R50 million. A tender set aside for them accepts only businesses of that size as the main bidder, shown by a sworn affidavit.
General explanations of South African public procurement, not this tender's requirements: the tender pack decides.
Check it against your business
Answer a few questions and see what would stop you bidding, what to confirm and what we can't tell from the listing.
Confirmed for this tender
Reserved for QSEsRead from official document
Only these business sizes may bid as the main contractor.
Source: RFP - HVT.pdf · page 34: “…and attested by a Commissioner of Oaths confirming annual turnover and black ownership (only black- owned QSEs - 51% to 100% Black owned) [Sworn affidavits must substantially comply with the format that can be obtained on the DTI's website at…”
Not confirmed
CIDB gradeNot confirmed
No tender-specific CIDB grade was found in the available listing or documents.
Check the official documents before you decide to bid.
We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.
Where and how to submit
Submit electronically (online)
Must arrive before Thursday, 10 December 2026 at 12:00 SAST. Late bids are never accepted.
“…PM BID VALIDITY PERIOD: 180 Business Days from Closing Date SUBMISSION TO: Transnet e-tender submission portal – see SBD 1 for details NAME OF COMPANY : CONTACT PERSON : CONTACT NUMBER : EMAIL ADDRESS : CSD NUMBER :” (RFP - HVT.pdf, page 1)
- Submit on the eTenders portal
- Tender documents (the submission details are in the bid document)
- Find it on eTenders: search for TE/2026/06/2247/6980/RFP
- Ask Mluleki Sishi: sishi.mluleki@transnet.net
- Register on the portal early and upload a day ahead: last-minute uploads fail. Save the submission confirmation.
ZA Network never submits bids for you. The tender documents are the final word on where and how.
Before you submit
Most bids that fail are never scored on price. General guidance on the usual reasons; the tender pack sets this tender's rules. Why bids get disqualified
Sign every SBD form
Usually SBD 1, SBD 3.1, SBD 4 and SBD 6.1, as issued in this tender pack. One unsigned form can disqualify the bid; the signatory must be authorised to sign for the business.
Tax compliance status valid on the closing date
Check it on SARS eFiling before 10 Dec 2026. A status that lapses before closing can cost you the award.
CSD profile compliant, details matching
Your CSD record should show as compliant, with the same name, registration number and directors as CIPC, SARS and your B-BBEE documents.
Proof for every point you claim
Your B-BBEE affidavit or certificate, and anything else the SBD 6.1 asks for, must support the specific-goal points you claim.
Proof you're an QSE
This tender is reserved. Include the affidavit or certificate that shows your business size.
The buyer's pricing schedule, complete
Use the schedule exactly as issued, fill in every line, and check whether prices must include VAT.
Every returnable schedule
List the returnable documents from the tender pack itself and tick them off, rather than relying on your last bid.
Submit a day early
Late bids aren't considered, even by a minute. Aim to submit by 09 Dec 2026, and check the address or upload method twice.
Official documents
- pdfAnnexure A - Specification.pdfFrom eTenders, 24 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfAnnexure B - Technical Evaluation Criteria.pdfFrom eTenders, 24 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE C - MASTER AGREEMENT.pdfFrom eTenders, 24 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE D - TRANSNET GENERAL BID CONDITIONS.pdfFrom eTenders, 24 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE E - TRANSNET SUPPLIER INTERGRITY PACT.pdfFrom eTenders, 24 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfANNEXURE F - Non Disclosure Agreement.pdfFrom eTenders, 24 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
- pdfRFP - HVT.pdfFrom eTenders, 24 Nov 2026Read for this tender's requirements by our rules.(opens in a new tab)
Read from the official documents
What the tender documents say
Read by rules from 7 of 7 documents, 24 Nov 2026, 10:50. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.
- Reserved for
QSEs only
“…and attested by a Commissioner of Oaths confirming annual turnover and black ownership (only black- owned QSEs - 51% to 100% Black owned) [Sworn affidavits must substantially comply with the format that can be obtained on the DTI's website at…” (RFP - HVT.pdf, page 34)
- Subcontracting required
At least 30% of the contract
“…NIPP NIPP Returnable documents Creation of new jobs and labour intensification Section Job Creation Schedule Returnable documents The promotion of supplier development through sub-contracting or JV for a minimum of 30% of the value of a contract to South African Companies which are: I. 30% Black Women owned, 51% Black Youth and 51% Black…” (RFP - HVT.pdf, page 33)
- Specific goals
Women ownership, Youth ownership, Black ownership, People with disabilities
“…1 or 2 = 5 50% black youth owned entities = 5 30% black women owned entities = 5 QSE's or EME's generally = 5 Total points for Price and Specific…” (RFP - HVT.pdf, page 31)
- How to submit
Electronically (online)
“…PM BID VALIDITY PERIOD: 180 Business Days from Closing Date SUBMISSION TO: Transnet e-tender submission portal – see SBD 1 for details NAME OF COMPANY : CONTACT PERSON : CONTACT NUMBER : EMAIL ADDRESS : CSD NUMBER :” (RFP - HVT.pdf, page 1)
- Documents the pack mentions
- Proof of briefing attendance (Annexure A - Specification.pdf, p. 7)
- CSD registration report (RFP - HVT.pdf, p. 24)
- Tax compliance status (SARS PIN) (RFP - HVT.pdf, p. 4)
- B-BBEE certificate or sworn affidavit (RFP - HVT.pdf, p. 3)
- Company registration documents (CIPC) (RFP - HVT.pdf, p. 24)
- Joint venture or consortium agreement (RFP - HVT.pdf, p. 7)
- Audited financial statements (RFP - HVT.pdf, p. 9)
- Reference letters from previous clients (RFP - HVT.pdf, p. 14)
- Disqualification rules
- “Respondents are to note that changes to its submission will not be considered after the closing date” (RFP - HVT.pdf, p. 8)
- “c) Any disbursement not specifically priced for will not be considered/accepted by Transnet” (RFP - HVT.pdf, p. 17)
- “The bidder understands that his/her Bid will be disqualified if the Certificate of Acquaintance with RFP documents included in the RFP as a returnable document, is found not to be true and complete in every respect” (RFP - HVT.pdf, p. 26)
- “Late Bids will not be considered” (ANNEXURE D - TRANSNET GENERAL BID CONDIT, p. 3)
- “Failure to submit mandatory returnable schedules / documents will result in disqualification” (ANNEXURE D - TRANSNET GENERAL BID CONDIT, p. 4)
- “PRICES SUBJECT TO CONFIRMATION Prices which are quoted subject to confirmation will not be considered” (ANNEXURE D - TRANSNET GENERAL BID CONDIT, p. 5)
- “Respondents will be afforded an opportunity to withdraw an unacceptable deviation, failing which the respondent will be disqualified” (ANNEXURE D - TRANSNET GENERAL BID CONDIT, p. 6)
Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.
My preparation
Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.
Sign in to save this tender, tick documents off and record your submission.
Documents to submit
General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.
Sign in to tick documents off and track your progress.
General guidance
Not part of this listing: what usually applies to South African public tenders.
Need money to deliver this? Tender and contract finance
Winning usually means paying for stock, staff and transport before the buyer pays. Public funders such as SEDFA and the National Empowerment Fund offer bridging and purchase-order finance to businesses with a firm contract or order.
Tender and contract financeHow to fund a contractGrants and programmes
If you win: payment terms, and the cash to carry
Government must pay within 30 days of a correct invoice, but many buyers pay late. Check the cash you'll need to carry.
Description
From the official listing.
SUPPLY, DELIVERY, TESTING AND COMMISSIONING OF HIGH VOLTAGE TESTERS FOR THE ROTATING MACHINES DEPOT IN DURBAN ON AN ‘AS AND WHEN REQUIRED’ BASIS
Contact person
Mluleki Sishi
About this data
- Source
- National Treasury eTenders
- Freshness
- Last checked 27 Nov 2026, 02:37. The official source last confirmed this listing 27 Nov 2026, 02:37. Check the official page for late changes.Last confirmed by eTenders on 27 Nov 2026, 02:37 (SAST). This page was generated on 28 Nov 2026, 11:59 (SAST). The status shown is only as current as the first of these.
- Official link
- Link not checked yet. We haven't checked that the official page opens.
- Open Contracting ID
- ocds-9t57fa-179595
- On eTenders
- Open the eTenders tender list and search for TE/2026/06/2247/6980/RFP. The official record is also available as raw data.
- Missing from the listing
- Estimated value: eTenders rarely publishes a value. We never estimate one.
Report a problem with this data
South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.