Skip to content
ZA NetworkGet started
Public tender · eTendersState-owned companyTender no. E3497GCMWP

The supply, delivery, installation, commissioning, and provision of training for a turbidity meter at research testing and development (ONCE - off)

ESKOM

This tender has closed. It's kept here for reference.

Closes

Closed

Wednesday, 30 September 2026 at 10:00 SAST

Can you bid?

Confirmed for this tender:

At least 75% on functionality

Not confirmed: CIDB grade 7 or higher.

Next step

This tender has closed. Look at similar open tenders instead.

Not recently confirmed. 22 official documents. Missing from the listing: contact details, province, estimated value.

In short

What they want
The supply, delivery, installation, commissioning, and provision of training for a turbidity meter at research testing and development (ONCE - off)
What must be delivered
We couldn't find the scope of work in the documents we read. Look for "scope of work", "specification" or "terms of reference" in the official documents.
How much and how long
12 months
Who can bid
Not stated in the listing or the documents we read: no CIDB grade, PSIRA requirement or set-aside was found. That doesn't mean none applies: the tender document decides.
How it's scored
  • You need at least 75% on functionality (quality) before price counts

A summary from the listing and the tender's documents. The official documents are the final word.

Key facts

Estimated value
Not published. We never estimate one.Work out your preference points
Industry
Consulting and advisory, Training and skills
Briefing session
None listed
CIDB grading
Grade 7 or higher
Functionality threshold
75%
Type
Tender (request for bid)Published as “Request for Bid(Open-Tender)”
Published
08 Sept 2026

Can your business bid on this?

ZA Network guidance, not part of the official listing.

What these terms mean: CSD, Tax compliance status, B-BBEE, SBD forms, CIDB, Functionality threshold
CSD (Central Supplier Database)
National Treasury's register of suppliers to government. A government buyer checks it before it awards work, and most tenders ask for your CSD number. Registering is free and needs your company registration, tax and bank details. Register on the CSD(opens in a new tab)
Tax compliance status (SARS tax status, checked with a PIN)
SARS's confirmation that your tax affairs are in order. The buyer checks it with the tax compliance status PIN from eFiling, so the PIN goes in the bid. It must be valid on the closing date, not only on the day you submit.
B-BBEE (Broad-Based Black Economic Empowerment)
A business's B-BBEE status, from level 1 (highest) to level 8, or non-compliant, shown on a certificate or, for a small business (EME or QSE), on a sworn affidavit. In a public tender it earns preference points; it is not a pass or a fail on its own.
SBD forms (Standard Bidding Documents)
National Treasury's standard forms in every national and provincial tender pack: SBD 1 (the invitation and your details), SBD 3.1 (pricing), SBD 4 (declaration of interest) and SBD 6.1 (preference points claim). Each must be filled in and signed as issued; one unsigned form can disqualify a bid.
CIDB (Construction Industry Development Board)
The register of contractors for construction work. Each contractor holds a grade from 1 to 9 (the largest contract it may take on) in a class of work, such as GB for general building or CE for civil engineering. A tender that names a grade accepts only contractors registered at that grade or higher in that class. CIDB registration information(opens in a new tab)
Functionality threshold (The minimum quality score)
Before price and preference points count, bids are scored for quality: experience, method, team, references, as the tender's scoring table sets out. A bid under the threshold (for example 70 out of 100) is out, whatever its price.

General explanations of South African public procurement, not this tender's requirements: the tender pack decides.

Confirmed for this tender

  • At least 75% on functionalityRead from official document

    Bids below the threshold aren't scored on price.

    Source: E3497GCMWP_Invitation to Tender (ITT)_Turbitity Meter_08 September 2026 (002).pdf · page 8: “…section of the respective Invitation to Tender. 3.13 Functionality requirements Functionality requirements are applicable The following criteria will be applicable for this transaction under functionality criteria: Criteria Weight Technical 100% Threshold 75% Refer to Annexure K (Technical Evaluation) Tenderers who do not meet the threshold for functionality scoring will be disqualified. 3.15…”

Not confirmed

  • CIDB grade 7 or higherNot confirmed

    An earlier reading took this from a general document in the pack, not from this tender's own requirements, so it isn't confirmed.

  • Tender documents reviewed: 4 / 20 relevant documentsNot confirmed

    16 documents still need review: Acknowledgement Form Life-saving Rules.docx (a format we can't read); 37-2 agreement form.docx (a format we can't read); Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx (a format we can't read); Acknowledgement Form Life-saving Rules.docx (a format we can't read); Annexure B – Supplier Tender Receiving Acknowledgement Form.docx (a format we can't read); Annexure C - Tenderer_s Particulars.docx (a format we can't read); Annexure D - Integrity Declaration Form.docx (a format we can't read); Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx (a format we can't read); Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.docx (a format we can't read); Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.docx (a format we can't read); Annexure H - SBD 1 - Part A - Invitation to Bid and Part B - Terms and Conditions for Bidding.docx (a format we can't read); Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.docx (a format we can't read); Annexure J - SBD 4 - Tenderer_s Disclosure.docx (a format we can't read); E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (a format we can't read); E-tendering Help Manual for supplier - 27 January 2025.docx (a format we can't read); OHS Evaluation.docx (a format we can't read). Requirements in them aren't confirmed.

Check the official documents before you decide to bid.

Sign up to check your readiness

We compare your CSD, CIDB, B-BBEE and PSIRA status with every rule and tell you what to fix. This is a guide, not legal advice. Always read the official tender documents.

Official documents

Read from the official documents

What the tender documents say

Read by rules from 6 of 22 documents (16 couldn't be read: scanned pages, a format we can't read, or a download that failed; each one is marked under Official documents), 29 Sept 2026, 02:20. Anything not listed here wasn't found by our rules. That doesn't mean it isn't required.

CIDB grading

Grade 7 or higher

“…service or service contract or an order issued in terms of such a contract; or a CIDB grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract.…” (Eskom - Standard Conditions of Tender - 30 January 2025.pdf, page 6)

Functionality threshold

Minimum 75% to be evaluated on price

“…section of the respective Invitation to Tender. 3.13 Functionality requirements Functionality requirements are applicable The following criteria will be applicable for this transaction under functionality criteria: Criteria Weight Technical 100% Threshold 75% Refer to Annexure K (Technical Evaluation) Tenderers who do not meet the threshold for functionality scoring will be disqualified. 3.15…” (E3497GCMWP_Invitation to Tender (ITT)_Turbitity Meter_08 September 2026 (002).pdf, page 8)

How to submit

Electronically (online)

“…questions should be sent by email to mokoatma@eskom.co.za Tenders are to be submitted electronically via Eskom E- tendering site by the stipulated closing date and time. Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time All tenders should be submitted via Eskom E- tendering:…” (E3497GCMWP_Invitation to Tender (ITT)_Turbitity Meter_08 September 2026 (002).pdf, page 1)

Bid validity

180 days after closing

“…2026 Closing date and time 30 September at 10h00 South African Standard Time (SAST Tender validity period 180 days from the closing date and time Clarification meeting Clarification meeting will not be held. Clarification questions should be sent by…” (E3497GCMWP_Invitation to Tender (ITT)_Turbitity Meter_08 September 2026 (002).pdf, page 1)

Contract period

12 months

“…for guidelines on this). 1. Application of CPA • CPA conditions may apply if the contractual duration is to be longer than 12 months. • If the contractual duration will be less than or equal to 12 months, a fixed priced offer must be submitted. • For contracts with a…” (E3497GCMWP_Invitation to Tender (ITT)_Turbitity Meter_08 September 2026 (002).pdf, page 32)

Documents the pack mentions
  • CSD registration report (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 9)
  • Tax compliance status (SARS PIN) (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 13)
  • B-BBEE certificate or sworn affidavit (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 10)
  • CIDB registration certificate (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 23)
  • COIDA letter of good standing (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 15)
  • Company registration documents (CIPC) (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 23)
  • Joint venture or consortium agreement (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 5)
Disqualification rules
  • “Criteria Weight Technical 100% Threshold 75% Refer to Annexure K (Technical Evaluation) Tenderers who do not meet the threshold for functionality scoring will be disqualified” (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 8)
  • “If not completed, signed (if required on the returnable) and/or submitted by tender closing, the tenderer will be disqualified” (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 11)
  • “If the returnable is not completed, signed if required and/or received by the Procurement Practitioner within 5 working days of the request, the tenderer will be disqualified” (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 11)
  • “A tender will be disqualified if the tenderer/s, or any of its directors have: 1” (E3497GCMWP_Invitation to Tender (ITT)_Tu, p. 29)
  • “Tenderers that Eskom finds to be ineligible will be disqualified” (Eskom - Standard Conditions of Tender - , p. 2)
  • “Any tender that is based on 100% sub-contracting will be deemed ineligible and will be disqualified” (Eskom - Standard Conditions of Tender - , p. 2)
  • “If an original tender is not submitted at all, or a copy of the original tender is not submitted at all, the tenderer will be disqualified” (Eskom - Standard Conditions of Tender - , p. 3)
  • “Failure to attend a clarification meeting or site visit that is identified as compulsory will result in disqualification from participation” (Eskom - Standard Conditions of Tender - , p. 4)
  • “the tender will be disqualified” (Eskom - Standard Conditions of Tender - , p. 6)
  • “If the SDL&I Undertaking is not completed and submitted as indicated in the Invitation to Tender, the tender will not be considered for contract award” (Eskom - Standard Conditions of Tender - , p. 7)

Quoted from the official documents so you can check them. Facts marked “Read by AI” were found by AI where our rules found nothing; their quotes are checked word for word against the document. The documents themselves are the final word.

Changes to this tender

  1. New or amended document · noticed 28 Sept 2026

    New document published: Acknowledgement Form Life-saving Rules.docx

  2. New or amended document · noticed 28 Sept 2026

    New document published: Pricing Data.pdf

  3. New or amended document · noticed 28 Sept 2026

    New document published: Annexure B – Supplier Tender Receiving Acknowledgement Form.docx

  4. New or amended document · noticed 28 Sept 2026

    New document published: Annexure F - CPA (IG) Requirements for Foreign Goods and Services.docx

  5. New or amended document · noticed 28 Sept 2026

    New document published: Eskom General Conditions of Purchase - 31 May 2024.pdf

  6. New or amended document · noticed 28 Sept 2026

    New document published: Eskom - Standard Conditions of Tender - 30 January 2025.pdf

  7. New or amended document · noticed 28 Sept 2026

    New document published: E-tendering Help Manual for supplier - 27 January 2025.docx

  8. New or amended document · noticed 28 Sept 2026

    New document published: Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx

  9. New or amended document · noticed 28 Sept 2026

    New document published: Annexure D - Integrity Declaration Form.docx

  10. New or amended document · noticed 28 Sept 2026

    New document published: Eskom Supplier Integrity Pact - 02 June 2023.pdf

  11. New or amended document · noticed 28 Sept 2026

    New document published: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx

  12. New or amended document · noticed 28 Sept 2026

    New document published: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.docx

  13. New or amended document · noticed 28 Sept 2026

    New document published: Authorisation Form - 08 November 2024.pdf

  14. New or amended document · noticed 28 Sept 2026

    New document published: Annexure H - SBD 1 - Part A - Invitation to Bid and Part B - Terms and Conditions for Bidding.docx

  15. New or amended document · noticed 28 Sept 2026

    New document published: Annexure J - SBD 4 - Tenderer_s Disclosure.docx

  16. New or amended document · noticed 28 Sept 2026

    New document published: OHS Evaluation.docx

  17. New or amended document · noticed 28 Sept 2026

    New document published: Annexure C - Tenderer_s Particulars.docx

  18. New or amended document · noticed 28 Sept 2026

    New document published: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.docx

  19. New or amended document · noticed 28 Sept 2026

    New document published: E3497GCMWP_Invitation to Tender (ITT)_Turbitity Meter_08 September 2026 (002).pdf

  20. New or amended document · noticed 28 Sept 2026

    New document published: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.docx

  21. New or amended document · noticed 28 Sept 2026

    New document published: 37-2 agreement form.docx

My preparation

Your team's own record. ZA Network verifies none of it, sends none of it to the buyer, and never submits a bid for you.

Sign in to save this tender, tick documents off and record your submission.

Documents to submit

General guidance: government tenders usually ask for SBD forms and these documents. Items marked “for this tender” come from this listing or its documents. The tender pack has the final list.

Sign in to tick documents off and track your progress.

Description

From the official listing.

THE SUPPLY, DELIVERY, INSTALLATION, COMMISSIONING, AND PROVISION OF TRAINING FOR A TURBIDITY METER AT RESEARCH TESTING AND DEVELOPMENT (ONCE - OFF)

About this data

Source
National Treasury eTenders
Freshness
Not recently confirmed. The official source last confirmed this listing 07 Oct 2026, 15:21. It may have changed or been withdrawn: check the official page before relying on it.Last confirmed by eTenders on 07 Oct 2026, 15:21 (SAST). This page was generated on 28 Nov 2026, 12:42 (SAST). The status shown is only as current as the first of these.
Official link
Link not checked yet. We haven't checked that the official page opens.
Open Contracting ID
ocds-9t57fa-169516
On eTenders
Open the eTenders tender list and search for E3497GCMWP. The official record is also available as raw data.
Missing from the listing
  • Contact details: There's no one to ask for clarification.
  • Province: Where the work is wasn't published.
  • Estimated value: eTenders rarely publishes a value. We never estimate one.
Possible duplicate listings
Same buyer and tender number: The supply, delivery, installation, commissioning, and provision of training for a turbidity meter at research testing and development (ONCE - off). Check which one the buyer is still using.

Report a problem with this data

South African government tender data: National Treasury eTenders portal (data.etenders.gov.za), licensed under CC BY 4.0 as stated on the portal. ZA Network is an independent company, not part of government, and does not verify or guarantee tenders.

Similar open tenders

  1. State-owned companyTender (request for bid)Gauteng

    For the design, supply, delivery, installation and commissioning of a hybrid wind and solar PV microgrid Research facility at Eskom Research, Testing and…

    ESKOM

    Closes 15 Dec 2026, 10:00

    • Renewable energy
    • Construction
    • +1 more
    • CIDB 7
    • Functionality 80%